![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_22.34 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | WRKY | ||||||||
| Protein Properties | Length: 193aa MW: 22597.6 Da PI: 8.958 | ||||||||
| Description | WRKY family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | WRKY | 103.4 | 1.2e-32 | 118 | 176 | 1 | 59 |
---SS-EEEEEEE--TT-SS-EEEEEE-STT---EEEEEE-SSSTTEEEEEEES--SS- CS
WRKY 1 ldDgynWrKYGqKevkgsefprsYYrCtsagCpvkkkversaedpkvveitYegeHnhe 59
ldDgy+WrKYGqK+vk+s +prsYYrCt+++C+vkk+ver +ed ++v++tYeg+Hnh+
evm.model.supercontig_22.34 118 LDDGYKWRKYGQKVVKNSLHPRSYYRCTHNNCRVKKRVERLSEDCRMVITTYEGRHNHT 176
59********************************************************7 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| Gene3D | G3DSA:2.20.25.80 | 2.5E-34 | 103 | 176 | IPR003657 | WRKY domain |
| SuperFamily | SSF118290 | 4.84E-29 | 110 | 177 | IPR003657 | WRKY domain |
| PROSITE profile | PS50811 | 29.792 | 113 | 178 | IPR003657 | WRKY domain |
| SMART | SM00774 | 1.1E-37 | 118 | 177 | IPR003657 | WRKY domain |
| Pfam | PF03106 | 2.9E-25 | 119 | 175 | IPR003657 | WRKY domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| GO:0043565 | Molecular Function | sequence-specific DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 193 aa Download sequence Send to blast |
MEGTDRSVSA NYQLQVSFPA TQSINHMGFV QLEENQLLSN NFLGSSSQPL NNFSTHHRQA 60 ADTVNHPKVN EENYTANAND AHTSWWRNST SEKNKVKVRR KLREPRFCFQ TRSDVDVLDD 120 GYKWRKYGQK VVKNSLHPRS YYRCTHNNCR VKKRVERLSE DCRMVITTYE GRHNHTPSDD 180 FNSSEHECFT SFX |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 1wj2_A | 4e-27 | 109 | 175 | 8 | 74 | Probable WRKY transcription factor 4 |
| 2lex_A | 4e-27 | 109 | 175 | 8 | 74 | Probable WRKY transcription factor 4 |
| Search in ModeBase | ||||||
| Nucleic Localization Signal ? help Back to Top | |||
|---|---|---|---|
| No. | Start | End | Sequence |
| 1 | 96 | 102 | KVRRKLR |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Transcription factor. Interacts specifically with the W box (5'-(T)TGAC[CT]-3'), a frequently occurring elicitor-responsive cis-acting element (By similarity). {ECO:0000250}. | |||||
| Binding Motif ? help Back to Top | |||
|---|---|---|---|
| Motif ID | Method | Source | Motif file |
| MP00618 | PBM | Transfer from AT2G44745 | Download |
| |||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_22.34 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | Retrieve | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021903303.1 | 1e-144 | probable WRKY transcription factor 12 | ||||
| Swissprot | Q93WY4 | 4e-73 | WRK12_ARATH; Probable WRKY transcription factor 12 | ||||
| TrEMBL | A0A1Q3CW67 | 1e-95 | A0A1Q3CW67_CEPFO; WRKY domain-containing protein | ||||
| STRING | evm.model.supercontig_22.34 | 1e-143 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM6045 | 25 | 46 | Representative plant | OGRP14 | 17 | 875 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT2G44745.1 | 2e-75 | WRKY family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_22.34 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




