![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_23.65 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | bHLH | ||||||||
| Protein Properties | Length: 365aa MW: 39604.4 Da PI: 7.4142 | ||||||||
| Description | bHLH family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | HLH | 11.7 | 0.00048 | 228 | 266 | 12 | 55 |
HHHHHHHHHHHHHCTSCCC...TTS-STCHHHHHHHHHHHHHHH CS
HLH 12 RRdriNsafeeLrellPkaskapskKlsKaeiLekAveYIksLq 55
R +++ +++ L +l+ + +K + a++L +A+ YI+ Lq
evm.model.supercontig_23.65 228 RKEKLGDRITALHQLVSPF-----GKTDTASVLLEAIGYIRFLQ 266
6677889999999999998.....8******************9 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| PROSITE profile | PS50888 | 11.414 | 216 | 265 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| SuperFamily | SSF47459 | 6.15E-10 | 226 | 276 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| CDD | cd00083 | 7.15E-6 | 226 | 270 | No hit | No description |
| Gene3D | G3DSA:4.10.280.10 | 3.1E-7 | 230 | 272 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0046983 | Molecular Function | protein dimerization activity | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 365 aa Download sequence Send to blast |
MNRGVLQSSP VQQMMAGNPN WWNMNGVRPM VIPPLTSTHQ QPPSPFLPPP PTLFPHHYTL 60 NPSSSSSSSS VFPLPSWHGS PDQLPESWSQ LLLGGLVGEE EKAAMGHFQA KKLESWEEQV 120 LHQPPNGGGV VEVKQENSAS SFVYGHANED FQAKPTWSHH HQVMPVSSPK SCVTTFSSNM 180 LDFSTNNKSD GRHPPPDRSS ECNSPASGGA VKKARVQASS SQPTFKVRKE KLGDRITALH 240 QLVSPFGKTD TASVLLEAIG YIRFLQSQIE ALSLPYLGSA SSNIRHQQSV QGERNCVFPE 300 DPGQLLNDNC MKRKAGAAEQ DGHEEPKKDL RSRGLCLVPV SCTLQVGSDN GADYWAPALG 360 GGFR* |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_23.65 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021903268.1 | 0.0 | transcription factor bHLH68 isoform X1 | ||||
| Swissprot | Q8S3D1 | 1e-109 | BH068_ARATH; Transcription factor bHLH68 | ||||
| TrEMBL | A0A2C9UAT7 | 0.0 | A0A2C9UAT7_MANES; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_23.65 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM1872 | 28 | 51 | Representative plant | OGRP3780 | 7 | 14 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT4G29100.1 | 1e-101 | bHLH family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_23.65 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




