![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_235.5 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | C3H | ||||||||
| Protein Properties | Length: 271aa MW: 28512.4 Da PI: 8.6307 | ||||||||
| Description | C3H family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | zf-CCCH | 26.5 | 1.1e-08 | 78 | 103 | 2 | 27 |
-S---SGGGGTS--TTTTT-SS-SSS CS
zf-CCCH 2 ktelCrffartGtCkyGdrCkFaHgp 27
kt+ C+ + Ck+Gd+C+FaHg+
evm.model.supercontig_235.5 78 KTRMCNKYNTAEGCKFGDKCHFAHGE 103
89**********************96 PP
| |||||||
| 2 | zf-CCCH | 27.9 | 4e-09 | 237 | 262 | 1 | 27 |
--S---SGGGGTS--TTTTT-SS-SSS CS
zf-CCCH 1 yktelCrffartGtCkyGdrCkFaHgp 27
+kt+lC++f + G C +GdrC+FaHg+
evm.model.supercontig_235.5 237 FKTKLCDNFTK-GCCTFGDRCHFAHGM 262
69*********.*************95 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| PROSITE profile | PS50103 | 12.042 | 9 | 37 | IPR000571 | Zinc finger, CCCH-type |
| SMART | SM00356 | 1.7 | 9 | 36 | IPR000571 | Zinc finger, CCCH-type |
| SuperFamily | SSF90229 | 6.15E-6 | 10 | 35 | IPR000571 | Zinc finger, CCCH-type |
| Gene3D | G3DSA:4.10.1000.10 | 2.9E-7 | 11 | 34 | IPR000571 | Zinc finger, CCCH-type |
| SuperFamily | SSF90229 | 2.22E-8 | 74 | 107 | IPR000571 | Zinc finger, CCCH-type |
| PROSITE profile | PS50103 | 13.31 | 76 | 104 | IPR000571 | Zinc finger, CCCH-type |
| Gene3D | G3DSA:4.10.1000.10 | 3.8E-14 | 76 | 108 | IPR000571 | Zinc finger, CCCH-type |
| SMART | SM00356 | 0.025 | 76 | 103 | IPR000571 | Zinc finger, CCCH-type |
| Pfam | PF00642 | 6.3E-5 | 78 | 103 | IPR000571 | Zinc finger, CCCH-type |
| SuperFamily | SSF54791 | 3.21E-15 | 135 | 216 | IPR004088 | K Homology domain, type 1 |
| Gene3D | G3DSA:3.30.1370.10 | 8.5E-16 | 143 | 213 | IPR004088 | K Homology domain, type 1 |
| SMART | SM00322 | 7.4E-12 | 143 | 213 | IPR004087 | K Homology domain |
| PROSITE profile | PS50084 | 14.194 | 144 | 208 | IPR004088 | K Homology domain, type 1 |
| Pfam | PF00013 | 1.9E-11 | 146 | 210 | IPR004088 | K Homology domain, type 1 |
| CDD | cd00105 | 6.59E-14 | 148 | 208 | No hit | No description |
| Gene3D | G3DSA:4.10.1000.10 | 3.2E-15 | 234 | 267 | IPR000571 | Zinc finger, CCCH-type |
| PROSITE profile | PS50103 | 16.211 | 236 | 263 | IPR000571 | Zinc finger, CCCH-type |
| SuperFamily | SSF90229 | 1.57E-8 | 236 | 266 | IPR000571 | Zinc finger, CCCH-type |
| SMART | SM00356 | 3.0E-7 | 236 | 262 | IPR000571 | Zinc finger, CCCH-type |
| Pfam | PF00642 | 8.1E-7 | 237 | 262 | IPR000571 | Zinc finger, CCCH-type |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0003723 | Molecular Function | RNA binding | ||||
| GO:0046872 | Molecular Function | metal ion binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 271 aa Download sequence Send to blast |
MESFPSGIGS KSKPCTKFFS TSGCPFGEGC HFLHYVPGGF KTVSQMLNLG GNAAIPPAPR 60 NPVVPPSFAD GSSPTTVKTR MCNKYNTAEG CKFGDKCHFA HGEWELGKPS GPAYEDPHAM 120 GPGRMGGRIE PPQGHGAAAS FGASATAKIS VDASLAGAII GKNGVNSKQI CRVTGAKLSI 180 REHETDPNLR NIELEGTFDQ IKQASAMVRE LIVNVSSGSG MSMKNQSMLG SGPSNNFKTK 240 LCDNFTKGCC TFGDRCHFAH GMEELRKSGM * |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_235.5 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Nucleotide ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | |||
| GenBank | FQ393604 | 6e-38 | FQ393604.1 Vitis vinifera clone SS0AFA25YC11. | |||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021912694.1 | 0.0 | zinc finger CCCH domain-containing protein 14-like | ||||
| Swissprot | Q7F8R0 | 1e-114 | C3H14_ORYSJ; Zinc finger CCCH domain-containing protein 14 | ||||
| TrEMBL | A0A2C9UEI6 | 1e-163 | A0A2C9UEI6_MANES; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_235.5 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM2336 | 28 | 75 | Representative plant | OGRP1026 | 17 | 56 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT5G06770.1 | 3e-55 | C3H family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_235.5 |




