![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_27.2 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | HB-other | ||||||||
| Protein Properties | Length: 222aa MW: 23877.7 Da PI: 5.4522 | ||||||||
| Description | HB-other family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | Homeobox | 64.9 | 1.1e-20 | 39 | 94 | 2 | 57 |
T--SS--HHHHHHHHHHHHHSSS--HHHHHHHHHHCTS-HHHHHHHHHHHHHHHHC CS
Homeobox 2 rkRttftkeqleeLeelFeknrypsaeereeLAkklgLterqVkvWFqNrRakekk 57
kR+ t++qle+Le++++ + yps+++r+eL++klgL++rq ++WF+ rR k+kk
evm.model.supercontig_27.2 39 PKRQMKTPYQLETLEKVYAVETYPSEATRAELSEKLGLSDRQLQMWFCHRRLKDKK 94
69****************************************************98 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| Gene3D | G3DSA:1.10.10.60 | 2.9E-20 | 15 | 95 | IPR009057 | Homeodomain-like |
| SuperFamily | SSF46689 | 4.6E-18 | 25 | 94 | IPR009057 | Homeodomain-like |
| PROSITE profile | PS50071 | 16.52 | 35 | 95 | IPR001356 | Homeobox domain |
| SMART | SM00389 | 4.7E-19 | 37 | 99 | IPR001356 | Homeobox domain |
| Pfam | PF00046 | 2.3E-18 | 39 | 94 | IPR001356 | Homeobox domain |
| CDD | cd00086 | 2.89E-18 | 40 | 95 | No hit | No description |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0003677 | Molecular Function | DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 222 aa Download sequence Send to blast |
MEAGSDGETP VRNNSSNNNN NNGSNNKSLG NSSEGLAKPK RQMKTPYQLE TLEKVYAVET 60 YPSEATRAEL SEKLGLSDRQ LQMWFCHRRL KDKKEVPAKK PRKGIALPPP GSPEDELRVG 120 HEPDYGSGSG SGSGSSPFME SRKLGPGSSN SRGAMVDEGP IGRRYYESPQ TIMELRAIAC 180 VEAQLGEPLR EDGPILGMEF DPLPPGAFGA PIEVSCPVFI G* |
| Nucleic Localization Signal ? help Back to Top | |||
|---|---|---|---|
| No. | Start | End | Sequence |
| 1 | 87 | 94 | RRLKDKKE |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Transcriptional regulator required for the maintenance of the plant vegetative phase. In association with CHR11 or CHR17 may prevent the early activation of the vegetative-to-reproductive transition by regulating key genes that contribute to flower timing, such as FT, SEP1, SEP3, AGL8/FUL, SOC1 and FLC. {ECO:0000269|PubMed:22694359}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_27.2 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021902107.1 | 1e-144 | homeobox-DDT domain protein RLT1 | ||||
| Swissprot | F4HY56 | 4e-64 | RLT1_ARATH; Homeobox-DDT domain protein RLT1 | ||||
| TrEMBL | A0A0B0MXB4 | 5e-82 | A0A0B0MXB4_GOSAR; Homeobox ceh-5 | ||||
| TrEMBL | A0A1R3I1C2 | 1e-80 | A0A1R3I1C2_COCAP; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_27.2 | 1e-160 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM25681 | 3 | 3 | Representative plant | OGRP1577 | 16 | 34 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT1G28420.1 | 3e-60 | homeobox-1 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_27.2 |




