![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_289.6 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | bHLH | ||||||||
| Protein Properties | Length: 294aa MW: 32693 Da PI: 6.1817 | ||||||||
| Description | bHLH family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | HLH | 48.8 | 1.3e-15 | 55 | 104 | 2 | 55 |
HHHHHHHHHHHHHHHHHHHHHHHCTSCCC...TTS-STCHHHHHHHHHHHHHHH CS
HLH 2 rrahnerErrRRdriNsafeeLrellPkaskapskKlsKaeiLekAveYIksLq 55
r +h+ E+rRR++iN++f+ Lr+l+P++ ++K + a+ L +++eY+++Lq
evm.model.supercontig_289.6 55 RSKHSVTEQRRRSKINERFQILRDLIPHS----DQKKDTASFLLEVIEYVHYLQ 104
889*************************9....899999**************9 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SuperFamily | SSF47459 | 2.75E-18 | 51 | 124 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene3D | G3DSA:4.10.280.10 | 3.9E-22 | 52 | 125 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| PROSITE profile | PS50888 | 15.72 | 53 | 103 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| CDD | cd00083 | 1.37E-14 | 55 | 108 | No hit | No description |
| Pfam | PF00010 | 4.7E-13 | 55 | 104 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| SMART | SM00353 | 6.1E-12 | 59 | 109 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006351 | Biological Process | transcription, DNA-templated | ||||
| GO:0046983 | Molecular Function | protein dimerization activity | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 294 aa Download sequence Send to blast |
MRTEKGNPEE DEYEDEEFGS KKEGPSSNAP ATAVNNNNNN KNKDGKNNDR ANAMRSKHSV 60 TEQRRRSKIN ERFQILRDLI PHSDQKKDTA SFLLEVIEYV HYLQEKLQKY EGSYQGWSPE 120 PTKLVPWRNS HWRVQNLVNH PQSIKNGSGP GSTYTGKFEE NNITIAPSML TGSQNPLEPD 180 ANRDVACKVM DRQPELASDC VPAHPLQRPV SDAQTSECVS SDSLSQEELN IEGGTINISS 240 VYSQGVDLSQ ANISVQIDLG RRANRGMTSG TVSAKHATIE QLGVVRDEMR KAN* |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Positive brassinosteroid-signaling protein. | |||||
| Binding Motif ? help Back to Top | |||
|---|---|---|---|
| Motif ID | Method | Source | Motif file |
| MP00219 | DAP | Transfer from AT1G69010 | Download |
| |||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_289.6 |
| Regulation -- Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | INDUCTION: Repressed by heat treatment. {ECO:0000269|PubMed:12679534}. | |||||
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | Retrieve | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021912295.1 | 1e-159 | transcription factor BIM2 isoform X2 | ||||
| Refseq | XP_021912296.1 | 1e-159 | transcription factor BIM2 isoform X2 | ||||
| Swissprot | Q9CAA4 | 1e-106 | BIM2_ARATH; Transcription factor BIM2 | ||||
| TrEMBL | A0A061E9E2 | 1e-125 | A0A061E9E2_THECC; BES1-interacting Myc-like protein 2 | ||||
| STRING | evm.model.supercontig_289.6 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM5987 | 27 | 45 | Representative plant | OGRP1360 | 17 | 47 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT1G69010.1 | 1e-94 | BES1-interacting Myc-like protein 2 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_289.6 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




