![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_29.163 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | C2H2 | ||||||||
| Protein Properties | Length: 284aa MW: 31858.7 Da PI: 9.5454 | ||||||||
| Description | C2H2 family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | zf-C2H2 | 14.3 | 0.00012 | 187 | 209 | 1 | 23 |
EEETTTTEEESSHHHHHHHHHHT CS
zf-C2H2 1 ykCpdCgksFsrksnLkrHirtH 23
++C++C+k+F++ + L+ H r +
evm.model.supercontig_29.163 187 HRCEKCKKVFKSYHALVGHRRIC 209
79******************987 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| Pfam | PF13912 | 2.3E-6 | 4 | 27 | IPR007087 | Zinc finger, C2H2 |
| SMART | SM00355 | 0.07 | 4 | 26 | IPR015880 | Zinc finger, C2H2-like |
| PROSITE profile | PS50157 | 10.45 | 4 | 31 | IPR007087 | Zinc finger, C2H2 |
| PROSITE pattern | PS00028 | 0 | 6 | 26 | IPR007087 | Zinc finger, C2H2 |
| SuperFamily | SSF57667 | 1.22E-5 | 187 | 247 | No hit | No description |
| Pfam | PF13912 | 1.0E-4 | 187 | 207 | IPR007087 | Zinc finger, C2H2 |
| SMART | SM00355 | 17 | 187 | 207 | IPR015880 | Zinc finger, C2H2-like |
| Pfam | PF13912 | 1.0E-6 | 225 | 247 | IPR007087 | Zinc finger, C2H2 |
| SMART | SM00355 | 0.32 | 225 | 247 | IPR015880 | Zinc finger, C2H2-like |
| PROSITE profile | PS50157 | 9.265 | 225 | 247 | IPR007087 | Zinc finger, C2H2 |
| PROSITE pattern | PS00028 | 0 | 227 | 247 | IPR007087 | Zinc finger, C2H2 |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0046872 | Molecular Function | metal ion binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 284 aa Download sequence Send to blast |
MEKHKCKLCA RTFNNGRALG GHMKAHLTTL PLPPKTHHQL AHPSTDSASS SSPQNRHKTT 60 STNLEVEDKS LIYSLRENPK KSFRVADPEF SFAADSAAGS VVQDRESETE SRNPTRRRSK 120 RNRRHDNTSQ KKPIWDETTS SPEPASSVSD TSPEEDVALC LIMLSRDVWK KNKLQFDESD 180 DTIKSKHRCE KCKKVFKSYH ALVGHRRICL SPENFITKNH DQKSFQCPFC FRFFASGQAL 240 GGHKRSHLLV SSSSSSSVLK NSFIDLNMPA PVEDDQFSVV SDS* |
| Nucleic Localization Signal ? help Back to Top | |||
|---|---|---|---|
| No. | Start | End | Sequence |
| 1 | 111 | 123 | RNPTRRRSKRNRR |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_29.163 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021901865.1 | 0.0 | zinc finger protein ZAT4 | ||||
| TrEMBL | A0A2H5NTT7 | 1e-105 | A0A2H5NTT7_CITUN; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_29.163 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM17350 | 6 | 11 | Representative plant | OGRP2404 | 10 | 30 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT3G60580.1 | 6e-40 | C2H2-like zinc finger protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_29.163 |




