![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_3.138 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | HD-ZIP | ||||||||
| Protein Properties | Length: 244aa MW: 28194.2 Da PI: 5.0625 | ||||||||
| Description | HD-ZIP family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | Homeobox | 56.3 | 5.2e-18 | 34 | 88 | 2 | 56 |
T--SS--HHHHHHHHHHHHHSSS--HHHHHHHHHHCTS-HHHHHHHHHHHHHHHH CS
Homeobox 2 rkRttftkeqleeLeelFeknrypsaeereeLAkklgLterqVkvWFqNrRakek 56
+++++f++eq++ Le+ Fe++ + +++ + A +lgL+ rqV +WFqN+Ra++k
evm.model.supercontig_3.138 34 KNKRRFSDEQIRLLETIFESETRLEPRKKLQVAGELGLQPRQVAIWFQNKRARWK 88
56789*************************************************9 PP
| |||||||
| 2 | HD-ZIP_I/II | 119.9 | 1.3e-38 | 35 | 126 | 2 | 93 |
HD-ZIP_I/II 2 kkrrlskeqvklLEesFeeeekLeperKvelareLglqprqvavWFqnrRARtktkqlEkdyeaLkraydalkeenerLeke 83
+krr+s+eq++lLE+ Fe+e++Lep++K ++a eLglqprqva+WFqn+RAR+k+kqlE++y+aLk +y++l+++ e+Leke
evm.model.supercontig_3.138 35 NKRRFSDEQIRLLETIFESETRLEPRKKLQVAGELGLQPRQVAIWFQNKRARWKSKQLEHEYRALKGSYESLASQFESLEKE 116
79******************************************************************************** PP
HD-ZIP_I/II 84 veeLreelke 93
+++L +l++
evm.model.supercontig_3.138 117 KQALLVQLRK 126
****999976 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| Gene3D | G3DSA:1.10.10.60 | 2.2E-17 | 20 | 90 | IPR009057 | Homeodomain-like |
| SuperFamily | SSF46689 | 5.13E-17 | 24 | 92 | IPR009057 | Homeodomain-like |
| PROSITE profile | PS50071 | 17.248 | 30 | 90 | IPR001356 | Homeobox domain |
| SMART | SM00389 | 3.7E-16 | 32 | 94 | IPR001356 | Homeobox domain |
| Pfam | PF00046 | 1.9E-15 | 34 | 88 | IPR001356 | Homeobox domain |
| CDD | cd00086 | 8.36E-13 | 39 | 91 | No hit | No description |
| PRINTS | PR00031 | 8.7E-5 | 61 | 70 | IPR000047 | Helix-turn-helix motif |
| PROSITE pattern | PS00027 | 0 | 65 | 88 | IPR017970 | Homeobox, conserved site |
| PRINTS | PR00031 | 8.7E-5 | 70 | 86 | IPR000047 | Helix-turn-helix motif |
| Pfam | PF02183 | 8.6E-14 | 90 | 130 | IPR003106 | Leucine zipper, homeobox-associated |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| GO:0043565 | Molecular Function | sequence-specific DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 244 aa Download sequence Send to blast |
MEGSDDDDRH EKENPEAAET NCCSQQRKKK NRMKNKRRFS DEQIRLLETI FESETRLEPR 60 KKLQVAGELG LQPRQVAIWF QNKRARWKSK QLEHEYRALK GSYESLASQF ESLEKEKQAL 120 LVQLRKLSEL RTRSQDVNSG TEDLGGSKMD YTCGEPKIKC DPEGNQSLLQ EKSGDPCGLI 180 MSSSHEYSTE PELRGEEERF RVQKIEEQTD GSLGSNEKWD HGFDSETLFD QSCSSSNWLD 240 FWT* |
| Nucleic Localization Signal ? help Back to Top | |||
|---|---|---|---|
| No. | Start | End | Sequence |
| 1 | 26 | 37 | RKKKNRMKNKRR |
| 2 | 28 | 34 | KKNRMKN |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_3.138 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021909604.1 | 1e-179 | homeobox-leucine zipper protein ATHB-12-like | ||||
| TrEMBL | A0A0B2QD54 | 1e-57 | A0A0B2QD54_GLYSO; Homeobox-leucine zipper protein ATHB-7 | ||||
| TrEMBL | I1JYL0 | 1e-57 | I1JYL0_SOYBN; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_3.138 | 1e-179 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Representative plant | OGRP129 | 16 | 189 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT2G46680.1 | 2e-48 | homeobox 7 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_3.138 |




