![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_3.503 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | bHLH | ||||||||
| Protein Properties | Length: 283aa MW: 31099.9 Da PI: 6.7891 | ||||||||
| Description | bHLH family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | HLH | 26.5 | 1.1e-08 | 174 | 221 | 4 | 55 |
HHHHHHHHHHHHHHHHHHHHHCTSCCC...TTS-STCHHHHHHHHHHHHHHH CS
HLH 4 ahnerErrRRdriNsafeeLrellPkaskapskKlsKaeiLekAveYIksLq 55
+h+ +Er RR +iN+++ L++++P + k + a++L + ++Y++sLq
evm.model.supercontig_3.503 174 SHSLAERVRRGKINERLRCLQDIVPGC----YKTMGMAMMLDEIINYVQSLQ 221
8*************************9....356999**************9 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SuperFamily | SSF47459 | 3.93E-16 | 168 | 238 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| CDD | cd00083 | 3.28E-10 | 168 | 225 | No hit | No description |
| Gene3D | G3DSA:4.10.280.10 | 6.2E-16 | 170 | 231 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| PROSITE profile | PS50888 | 15.072 | 170 | 220 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Pfam | PF00010 | 6.0E-6 | 174 | 221 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| SMART | SM00353 | 5.5E-8 | 176 | 226 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006351 | Biological Process | transcription, DNA-templated | ||||
| GO:0046983 | Molecular Function | protein dimerization activity | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 283 aa Download sequence Send to blast |
MAGFSADLQS FRSSSFPFME TDNPNVESVN QFAGLNPSST AIADASNLVN FQSFLPFSAE 60 ALFGNQAPDF PPTFPENFLG IFQDSNQNAV MPIVSQPCVA PRITFNNHET KKRKSMEVVS 120 ESSSGISAPS PPVSDSGSKR KQSSGRGKRV KSNEDEKSKE VVHVRARRGQ ATDSHSLAER 180 VRRGKINERL RCLQDIVPGC YKTMGMAMML DEIINYVQSL QNQVEFLSMK LTAASTFYDF 240 NSESDAIETM QRAKAEESRE IVRLMKEGGF NGVGNLSSSW PL* |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Positive regulator of brassinosteroid signaling. {ECO:0000269|PubMed:12454087}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_3.503 |
| Regulation -- Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | INDUCTION: Induced by brassinosteroid, auxin and ethylene, and repressed by abscisic acid. Insensitive to gibberellic acid. {ECO:0000269|PubMed:12454087}. | |||||
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021909358.1 | 0.0 | transcription factor BEE 3 | ||||
| Swissprot | Q8GWK7 | 4e-70 | BEE3_ARATH; Transcription factor BEE 3 | ||||
| TrEMBL | A0A2K1Y9C0 | 1e-112 | A0A2K1Y9C0_POPTR; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_3.503 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM2997 | 27 | 65 | Representative plant | OGRP58 | 16 | 313 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT1G18400.1 | 2e-64 | BR enhanced expression 1 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_3.503 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




