![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_31.37 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | ZF-HD | ||||||||
| Protein Properties | Length: 276aa MW: 30581.2 Da PI: 8.392 | ||||||||
| Description | ZF-HD family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | ZF-HD_dimer | 104.9 | 5.1e-33 | 74 | 131 | 2 | 60 |
ZF-HD_dimer 2 ekvrYkeClkNhAaslGghavDGCgEfmpsegeegtaaalkCaACgCHRnFHRreveee 60
++vrY+eClkNhAa++Gg+++DGCgEfmps g++g+++alkCaAC+CHRnFHR+ev+ e
evm.model.supercontig_31.37 74 STVRYRECLKNHAANVGGNVYDGCGEFMPS-GDDGSIEALKCAACDCHRNFHRKEVDGE 131
579**************************9.999*********************9865 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| ProDom | PD125774 | 3.0E-24 | 71 | 129 | IPR006456 | ZF-HD homeobox protein, Cys/His-rich dimerisation domain |
| Pfam | PF04770 | 1.6E-29 | 76 | 128 | IPR006456 | ZF-HD homeobox protein, Cys/His-rich dimerisation domain |
| TIGRFAMs | TIGR01566 | 1.2E-30 | 77 | 128 | IPR006456 | ZF-HD homeobox protein, Cys/His-rich dimerisation domain |
| PROSITE profile | PS51523 | 26.048 | 78 | 127 | IPR006456 | ZF-HD homeobox protein, Cys/His-rich dimerisation domain |
| SuperFamily | SSF46689 | 2.6E-18 | 205 | 267 | IPR009057 | Homeodomain-like |
| Gene3D | G3DSA:1.10.10.60 | 2.0E-29 | 207 | 270 | IPR009057 | Homeodomain-like |
| TIGRFAMs | TIGR01565 | 1.9E-28 | 208 | 265 | IPR006455 | Homeodomain, ZF-HD class |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0009737 | Biological Process | response to abscisic acid | ||||
| GO:0045893 | Biological Process | positive regulation of transcription, DNA-templated | ||||
| GO:0005634 | Cellular Component | nucleus | ||||
| GO:0003677 | Molecular Function | DNA binding | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| GO:0042803 | Molecular Function | protein homodimerization activity | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 276 aa Download sequence Send to blast |
MEFRGEEGDI RVAGSSSPSG ERRRDGNQNG ITTTILTSIQ TIDHTPSHSH RQLDRNITSK 60 ISSISVGSNP AKPSTVRYRE CLKNHAANVG GNVYDGCGEF MPSGDDGSIE ALKCAACDCH 120 RNFHRKEVDG ETTQLGSSSN SRRNLILNPL QLPPPLPSPT MLHHHQKYPM HTATPMSVAF 180 GGGAESSSED LNPEGVVQPF PPPFGLSKKR FRTKFSQEQK EKMLEFAEKV GWRINKQDEE 240 QVERFCAEVG IKRQVFKVWM HNNKNNTVKK QPEDG* |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 1wh7_A | 7e-25 | 209 | 266 | 18 | 75 | ZF-HD homeobox family protein |
| Search in ModeBase | ||||||
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Putative transcription factor. Binds DNA at 5'-ATTA-3' consensus promoter regions. Regulates floral architecture and leaf development. Regulators in the abscisic acid (ABA) signal pathway that confers sensitivity to ABA in an ARF2-dependent manner. {ECO:0000269|PubMed:16428600, ECO:0000269|PubMed:21059647, ECO:0000269|PubMed:21779177}. | |||||
| Binding Motif ? help Back to Top | |||
|---|---|---|---|
| Motif ID | Method | Source | Motif file |
| MP00238 | DAP | Transfer from AT1G75240 | Download |
| |||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_31.37 |
| Regulation -- Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | INDUCTION: Repressed by abscisic acid (ABA) and ARF2. {ECO:0000269|PubMed:21779177}. | |||||
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | Retrieve | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021901507.1 | 0.0 | zinc-finger homeodomain protein 5-like | ||||
| Swissprot | Q9FRL5 | 1e-70 | ZHD5_ARATH; Zinc-finger homeodomain protein 5 | ||||
| TrEMBL | A0A061FD05 | 1e-107 | A0A061FD05_THECC; Homeobox protein 33 isoform 1 | ||||
| STRING | evm.model.supercontig_31.37 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM7279 | 25 | 43 | Representative plant | OGRP91 | 16 | 237 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT1G75240.1 | 2e-70 | homeobox protein 33 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_31.37 |




