![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_3143.1 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | HD-ZIP | ||||||||
| Protein Properties | Length: 395aa MW: 43520.7 Da PI: 5.4514 | ||||||||
| Description | HD-ZIP family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | Homeobox | 54.8 | 1.6e-17 | 223 | 277 | 2 | 56 |
T--SS--HHHHHHHHHHHHHSSS--HHHHHHHHHHCTS-HHHHHHHHHHHHHHHH CS
Homeobox 2 rkRttftkeqleeLeelFeknrypsaeereeLAkklgLterqVkvWFqNrRakek 56
rk+ +++keq Lee F+++++++ +++ LAk+l+L rqV vWFqNrRa+ k
evm.model.supercontig_3143.1 223 RKKLRLSKEQSAFLEESFKEHNTLNPKQKLALAKQLNLRPRQVEVWFQNRRARTK 277
778899***********************************************98 PP
| |||||||
| 2 | HD-ZIP_I/II | 127.6 | 5.5e-41 | 223 | 313 | 1 | 92 |
HD-ZIP_I/II 1 ekkrrlskeqvklLEesFeeeekLeperKvelareLglqprqvavWFqnrRARtktkqlEkdyeaLkraydalkeenerLe 81
+kk+rlskeq+++LEesF+e+++L+p++K +la++L+l+prqv+vWFqnrRARtk+kq+E+d+e+Lkr++++l+een+rL+
evm.model.supercontig_3143.1 223 RKKLRLSKEQSAFLEESFKEHNTLNPKQKLALAKQLNLRPRQVEVWFQNRRARTKLKQTEVDCEYLKRCCETLTEENRRLQ 303
69******************************************************************************* PP
HD-ZIP_I/II 82 keveeLreelk 92
ke +eLr +lk
evm.model.supercontig_3143.1 304 KELQELR-ALK 313
******9.555 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| Gene3D | G3DSA:1.10.10.60 | 4.2E-17 | 208 | 273 | IPR009057 | Homeodomain-like |
| SuperFamily | SSF46689 | 1.5E-18 | 210 | 280 | IPR009057 | Homeodomain-like |
| PROSITE profile | PS50071 | 17.216 | 219 | 279 | IPR001356 | Homeobox domain |
| SMART | SM00389 | 7.3E-16 | 221 | 283 | IPR001356 | Homeobox domain |
| CDD | cd00086 | 7.90E-16 | 223 | 280 | No hit | No description |
| Pfam | PF00046 | 5.4E-15 | 223 | 277 | IPR001356 | Homeobox domain |
| PROSITE pattern | PS00027 | 0 | 254 | 277 | IPR017970 | Homeobox, conserved site |
| Pfam | PF02183 | 8.4E-11 | 279 | 313 | IPR003106 | Leucine zipper, homeobox-associated |
| SMART | SM00340 | 5.6E-26 | 279 | 322 | IPR003106 | Leucine zipper, homeobox-associated |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| GO:0043565 | Molecular Function | sequence-specific DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 395 aa Download sequence Send to blast |
MELGLSLGET AKPAALGFMD RADHQKDLGF CMGLSIGSTT TTSPPPSPPQ QHQEDQRHED 60 GDDQADDDDD SIDQNDTTAP KKARRSTISE ALYGTDHHEP VQLDLLPNTP VLPFDPSSAN 120 GSSEADSPGR QMMVGCLRGF DVNRAPNNTN NNLIDQDQRN NNEDGAAVSS SPNSGSASSL 180 QIDFCIYSGG GGNLKDGHHH DQLDRSRASS RGGSDEDENG STRKKLRLSK EQSAFLEESF 240 KEHNTLNPKQ KLALAKQLNL RPRQVEVWFQ NRRARTKLKQ TEVDCEYLKR CCETLTEENR 300 RLQKELQELR ALKTSSPFYM QLPATTLTMC PSCERVATNN PTTDSSPSAA TFINRPSRLA 360 SANYPFPQPT STNTSIIPTS RDDHNNIHVK NIEN* |
| Nucleic Localization Signal ? help Back to Top | |||
|---|---|---|---|
| No. | Start | End | Sequence |
| 1 | 221 | 227 | TRKKLRL |
| 2 | 271 | 279 | RRARTKLKQ |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Probable transcription factor. {ECO:0000250}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_3143.1 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021912381.1 | 0.0 | homeobox-leucine zipper protein HOX11-like | ||||
| Swissprot | A2Z1U1 | 4e-84 | HOX11_ORYSI; Homeobox-leucine zipper protein HOX11 | ||||
| TrEMBL | B9HPS0 | 1e-112 | B9HPS0_POPTR; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_3143.1 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM4928 | 28 | 52 | Representative plant | OGRP196 | 16 | 156 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT5G06710.1 | 2e-67 | homeobox from Arabidopsis thaliana | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_3143.1 |




