![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_32.94 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | G2-like | ||||||||
| Protein Properties | Length: 367aa MW: 40812.1 Da PI: 7.9603 | ||||||||
| Description | G2-like family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | G2-like | 106.8 | 1.2e-33 | 32 | 86 | 1 | 55 |
G2-like 1 kprlrWtpeLHerFveaveqLGGsekAtPktilelmkvkgLtlehvkSHLQkYRl 55
kprlrWt eLHerFv+av+qLGG++kAtPkti+++m+vkgLtl+h+kSHLQk+Rl
evm.model.supercontig_32.94 32 KPRLRWTVELHERFVDAVTQLGGPDKATPKTIMRVMGVKGLTLYHLKSHLQKFRL 86
79****************************************************8 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| Gene3D | G3DSA:1.10.10.60 | 3.4E-32 | 29 | 87 | IPR009057 | Homeodomain-like |
| PROSITE profile | PS51294 | 12.347 | 29 | 89 | IPR017930 | Myb domain |
| SuperFamily | SSF46689 | 1.68E-16 | 31 | 87 | IPR009057 | Homeodomain-like |
| TIGRFAMs | TIGR01557 | 1.1E-23 | 32 | 87 | IPR006447 | Myb domain, plants |
| Pfam | PF00249 | 1.2E-7 | 34 | 84 | IPR001005 | SANT/Myb domain |
| Pfam | PF14379 | 3.3E-22 | 128 | 167 | IPR025756 | MYB-CC type transcription factor, LHEQLE-containing domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0010088 | Biological Process | phloem development | ||||
| GO:0010089 | Biological Process | xylem development | ||||
| GO:0045893 | Biological Process | positive regulation of transcription, DNA-templated | ||||
| GO:0005634 | Cellular Component | nucleus | ||||
| GO:0003677 | Molecular Function | DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 367 aa Download sequence Send to blast |
MFHSKKPSTM NSHDRPMCVQ GDSGLVLTTD PKPRLRWTVE LHERFVDAVT QLGGPDKATP 60 KTIMRVMGVK GLTLYHLKSH LQKFRLGKQP HKEFNDHSIK DGERASALDL QRSAASSSGI 120 IGRSMNEMQM EVQRRLHEQL EVQRHLQLRI EAQGKYMQSI LEKACQTLAG ENNIAAAAAS 180 YKGLGNHCGA DMGTMKNFVP PLNFSSFQDL NIYGGDQLDH HLQQNMDRSS SLDHGFMSND 240 DTLCLGKKRS NPYSTCSGKS PLIWADDPRL QEPSCLGPQD HDLFKHSAHD QMQIAPPNSI 300 DRGADHLESI SDIYETKPVL SGDHAMADKK FESTKLERPS PQRPSDRMSP MMNTGGMPQG 360 RNSPFG* |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 6j4r_A | 3e-19 | 32 | 88 | 1 | 57 | Protein PHOSPHATE STARVATION RESPONSE 1 |
| 6j4r_B | 3e-19 | 32 | 88 | 1 | 57 | Protein PHOSPHATE STARVATION RESPONSE 1 |
| 6j4r_C | 3e-19 | 32 | 88 | 1 | 57 | Protein PHOSPHATE STARVATION RESPONSE 1 |
| 6j4r_D | 3e-19 | 32 | 88 | 1 | 57 | Protein PHOSPHATE STARVATION RESPONSE 1 |
| Search in ModeBase | ||||||
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Transcription factor required for phloem identity. Has a dual role both in promoting phloem differentiation and in repressing xylem differentiation during vascular development. Regulates the expression of the transcription factor NAC045 (AC A4VCM0). May activate the transcription of specific genes involved in phosphate uptake or assimilation (PubMed:15592750). Promotes flowering through transcriptional activation of both FT and its transport machinery component, FTIP1 (PubMed:26239308). {ECO:0000269|PubMed:14614507, ECO:0000269|PubMed:18523061, ECO:0000269|PubMed:25081480, ECO:0000269|PubMed:26239308, ECO:0000305|PubMed:15592750}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_32.94 |
| Regulation -- Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | INDUCTION: Up-regulated by phosphate deficiency. {ECO:0000269|PubMed:15592750}. | |||||
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021901375.1 | 0.0 | myb family transcription factor APL isoform X3 | ||||
| Swissprot | Q9SAK5 | 1e-134 | APL_ARATH; Myb family transcription factor APL | ||||
| TrEMBL | A0A067F2F7 | 0.0 | A0A067F2F7_CITSI; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_32.94 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM5044 | 27 | 50 | Representative plant | OGRP78 | 17 | 262 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT1G79430.2 | 1e-129 | G2-like family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_32.94 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




