![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_33.182 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | bZIP | ||||||||
| Protein Properties | Length: 318aa MW: 35396.6 Da PI: 7.2555 | ||||||||
| Description | bZIP family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | bZIP_1 | 47.3 | 4.5e-15 | 247 | 295 | 5 | 54 |
CHHHCHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH CS
bZIP_1 5 krerrkqkNReAArrsRqRKkaeieeLeekvkeLeaeNkaLkkeleelkk 54
++++r++kNRe+A rsR+RK+a++ eLe+kv Le+eN++L+ + +el++
evm.model.supercontig_33.182 247 RKQKRMIKNRESAARSRARKQAYTHELENKVSRLEEENERLR-RQKELEN 295
689**************************************9.6666665 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| Gene3D | G3DSA:1.20.5.170 | 2.3E-13 | 239 | 294 | No hit | No description |
| SMART | SM00338 | 7.3E-13 | 243 | 311 | IPR004827 | Basic-leucine zipper domain |
| PROSITE profile | PS50217 | 11.576 | 245 | 290 | IPR004827 | Basic-leucine zipper domain |
| CDD | cd14707 | 5.04E-24 | 247 | 301 | No hit | No description |
| SuperFamily | SSF57959 | 2.75E-11 | 247 | 292 | No hit | No description |
| Pfam | PF00170 | 5.4E-12 | 247 | 290 | IPR004827 | Basic-leucine zipper domain |
| PROSITE pattern | PS00036 | 0 | 250 | 265 | IPR004827 | Basic-leucine zipper domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0009737 | Biological Process | response to abscisic acid | ||||
| GO:0005634 | Cellular Component | nucleus | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| GO:0043565 | Molecular Function | sequence-specific DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 318 aa Download sequence Send to blast |
MGSEGGEPNL QNLATQTSLY NLTLDEVQNQ LGNLGKPLGS MNLDELLKSV CSAEVNQSTP 60 LADDNVGITY TASGSALSRQ GSLALSRDLS RKTVDEVWRD IQKSKNKNDQ ERRCQERQLT 120 FGGMTLEDFL LKAGVVSEPT HVHVLGVESV IFSQPNIPHH PHWNQYQLPS LQQQQQQQHQ 180 QDVMALVPGQ PTQHPLPVGV NPDAAYPETQ VTISPSSLMG TLSDTQAQAP GRKRVASEDV 240 AEKNVERKQK RMIKNRESAA RSRARKQAYT HELENKVSRL EEENERLRRQ KELENALPCA 300 PPPEPKYQLR RTSSAPF* |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Binds to the embryo specification element and the ABA-responsive element (ABRE) of the Dc3 gene promoter. Could participate in abscisic acid-regulated gene expression during seed development. | |||||
| Binding Motif ? help Back to Top | |||
|---|---|---|---|
| Motif ID | Method | Source | Motif file |
| MP00409 | DAP | Transfer from AT3G56850 | Download |
| |||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_33.182 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | Retrieve | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021901347.1 | 0.0 | ABSCISIC ACID-INSENSITIVE 5-like protein 2 isoform X1 | ||||
| Swissprot | Q9LES3 | 1e-100 | AI5L2_ARATH; ABSCISIC ACID-INSENSITIVE 5-like protein 2 | ||||
| TrEMBL | A0A068VAQ2 | 1e-125 | A0A068VAQ2_COFCA; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_33.182 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM1884 | 28 | 83 | Representative plant | OGRP540 | 15 | 80 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT3G56850.1 | 6e-89 | ABA-responsive element binding protein 3 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_33.182 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




