![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_34.221 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | bZIP | ||||||||
| Protein Properties | Length: 242aa MW: 26736.2 Da PI: 9.0397 | ||||||||
| Description | bZIP family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | bZIP_1 | 42.2 | 1.7e-13 | 189 | 232 | 5 | 48 |
CHHHCHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH CS
bZIP_1 5 krerrkqkNReAArrsRqRKkaeieeLeekvkeLeaeNkaLkke 48
+r rrk+kNRe+A rsR+RK+a+ eL kv Le+eN +Lkke
evm.model.supercontig_34.221 189 RRLRRKIKNRESAARSRARKQAYHNELVSKVSHLEEENIRLKKE 232
5889**************************************97 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SMART | SM00338 | 2.1E-5 | 184 | 236 | IPR004827 | Basic-leucine zipper domain |
| PROSITE profile | PS50217 | 10.783 | 187 | 232 | IPR004827 | Basic-leucine zipper domain |
| Pfam | PF00170 | 4.3E-11 | 189 | 232 | IPR004827 | Basic-leucine zipper domain |
| SuperFamily | SSF57959 | 3.56E-10 | 189 | 232 | No hit | No description |
| Gene3D | G3DSA:1.20.5.170 | 9.3E-13 | 189 | 232 | No hit | No description |
| CDD | cd14707 | 1.74E-17 | 189 | 238 | No hit | No description |
| PROSITE pattern | PS00036 | 0 | 192 | 207 | IPR004827 | Basic-leucine zipper domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| GO:0043565 | Molecular Function | sequence-specific DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 242 aa Download sequence Send to blast |
MGSQSNGLQS HLHPSSLVRQ NSWYSLTLNE VEDQLGNLGK PLGSMNLDEL LKNVWTTEAT 60 QSMGIEITSP ASSLQRQASL SLARALSGKT VDQVWKEIQQ GQKKRYGDDL VGREPILGEV 120 TLEDFLVQAG LFAEASLSPS MDLDSVDAAI KQSFPQQTVL SPAPITTLLG TATPGRKRDQ 180 EAIERSIERR LRRKIKNRES AARSRARKQA YHNELVSKVS HLEEENIRLK KEKFDSCSIP 240 G* |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Binds to the embryo specification element and the ABA-responsive element (ABRE) of the Dc3 gene promoter. Could participate in abscisic acid-regulated gene expression during seed development. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_34.221 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021901007.1 | 1e-169 | ABSCISIC ACID-INSENSITIVE 5-like protein 2 isoform X1 | ||||
| Refseq | XP_021901008.1 | 1e-169 | ABSCISIC ACID-INSENSITIVE 5-like protein 2 isoform X1 | ||||
| Refseq | XP_021901010.1 | 1e-169 | ABSCISIC ACID-INSENSITIVE 5-like protein 2 isoform X3 | ||||
| Swissprot | Q9LES3 | 6e-56 | AI5L2_ARATH; ABSCISIC ACID-INSENSITIVE 5-like protein 2 | ||||
| TrEMBL | A0A2H5PEP7 | 1e-119 | A0A2H5PEP7_CITUN; Uncharacterized protein | ||||
| TrEMBL | V4U6F2 | 1e-119 | V4U6F2_9ROSI; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_34.221 | 1e-176 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM16714 | 10 | 12 | Representative plant | OGRP540 | 15 | 80 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT3G56850.1 | 6e-49 | ABA-responsive element binding protein 3 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_34.221 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




