![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_36.12 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | C2H2 | ||||||||
| Protein Properties | Length: 426aa MW: 46844.8 Da PI: 9.7874 | ||||||||
| Description | C2H2 family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | zf-C2H2 | 15.7 | 4.4e-05 | 191 | 213 | 2 | 23 |
EETTTTEEESSHHHHHHHHHH.T CS
zf-C2H2 2 kCpdCgksFsrksnLkrHirt.H 23
+Cp Cg+ F ++nL+ H+ + H
evm.model.supercontig_36.12 191 SCPECGEIFMKPENLELHQAVrH 213
6******************9888 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| PROSITE profile | PS50157 | 9.182 | 190 | 218 | IPR007087 | Zinc finger, C2H2 |
| PROSITE pattern | PS00028 | 0 | 192 | 213 | IPR007087 | Zinc finger, C2H2 |
| SuperFamily | SSF56399 | 1.15E-22 | 215 | 424 | No hit | No description |
| Gene3D | G3DSA:3.90.228.10 | 1.1E-16 | 216 | 423 | IPR012317 | Poly(ADP-ribose) polymerase, catalytic domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0003950 | Molecular Function | NAD+ ADP-ribosyltransferase activity | ||||
| GO:0046872 | Molecular Function | metal ion binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 426 aa Download sequence Send to blast |
MGKLKNKRNS ADETHQNQNK PPLKAEKPPS WALLRGIFNC KHIQPQDHEQ QQQKNQEPQQ 60 QGKQPKKQKQ QAVEEISSKK CKKMKCSGSL CSNTKVMHRP ETSSPEGQKK RASMEIASSR 120 SMKAPLQEIN GVGVVSSTNS SLSISSSSSI NGGSFRGMPF RRFSGCYECR MVVDPVLGIT 180 RDPSLRGSIS SCPECGEIFM KPENLELHQA VRHAVSELGP EDTSKNIVEI IFQSSWLKKQ 240 TPICKIDRIL KVHNTQKTIT KFEEYRDSIK AKATKFPKKH PRCIADGNEL LRFHCTTVAC 300 SLGLNGSSNL CNSIPHCNVC SIIKNGFKVA KEVDTKGILT TATSGKAHDK AGGVDQDGGN 360 EKRAMLVCRV IAGRVKKTTE GQGMGGMEEY DSVAGAVGLY SNLDELYVFN PKAILPCFVV 420 IYRGF* |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_36.12 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021900801.1 | 0.0 | uncharacterized protein LOC110816791 | ||||
| TrEMBL | A0A314Y302 | 0.0 | A0A314Y302_PRUYE; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_36.12 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM1916 | 28 | 80 | Representative plant | OGRP661 | 14 | 39 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT1G75710.1 | 1e-101 | C2H2-like zinc finger protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_36.12 |




