![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_36.134 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | MYB | ||||||||
| Protein Properties | Length: 353aa MW: 39040.8 Da PI: 6.2228 | ||||||||
| Description | MYB family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | Myb_DNA-binding | 62.4 | 9.1e-20 | 14 | 61 | 1 | 48 |
TSSS-HHHHHHHHHHHHHTTTT-HHHHHHHHTTTS-HHHHHHHHHHHT CS
Myb_DNA-binding 1 rgrWTteEdellvdavkqlGggtWktIartmgkgRtlkqcksrwqkyl 48
+g+WT+eEd++lvd+++++G g+W++ ++ g++R++k+c++rw +yl
evm.model.supercontig_36.134 14 KGPWTPEEDQILVDYIQKHGHGSWRALPKLAGLNRCGKSCRLRWTNYL 61
79********************************************97 PP
| |||||||
| 2 | Myb_DNA-binding | 55.1 | 1.8e-17 | 67 | 112 | 1 | 48 |
TSSS-HHHHHHHHHHHHHTTTT-HHHHHHHHTTTS-HHHHHHHHHHHT CS
Myb_DNA-binding 1 rgrWTteEdellvdavkqlGggtWktIartmgkgRtlkqcksrwqkyl 48
rg++++eE++ +++++ lG++ W++Ia +++ gRt++++k++w+++l
evm.model.supercontig_36.134 67 RGKFSQEEEQTILHLHSILGNK-WSAIATHLP-GRTDNEIKNFWNTHL 112
89********************.*********.************996 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| Gene3D | G3DSA:1.10.10.60 | 1.3E-26 | 5 | 64 | IPR009057 | Homeodomain-like |
| PROSITE profile | PS51294 | 18.929 | 9 | 61 | IPR017930 | Myb domain |
| SuperFamily | SSF46689 | 2.49E-32 | 11 | 108 | IPR009057 | Homeodomain-like |
| SMART | SM00717 | 5.7E-16 | 13 | 63 | IPR001005 | SANT/Myb domain |
| Pfam | PF00249 | 4.6E-18 | 14 | 61 | IPR001005 | SANT/Myb domain |
| CDD | cd00167 | 8.00E-13 | 16 | 61 | No hit | No description |
| PROSITE profile | PS51294 | 27.278 | 62 | 116 | IPR017930 | Myb domain |
| Gene3D | G3DSA:1.10.10.60 | 1.1E-27 | 65 | 117 | IPR009057 | Homeodomain-like |
| SMART | SM00717 | 9.2E-17 | 66 | 114 | IPR001005 | SANT/Myb domain |
| Pfam | PF00249 | 2.4E-16 | 67 | 112 | IPR001005 | SANT/Myb domain |
| CDD | cd00167 | 1.45E-12 | 69 | 112 | No hit | No description |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0009733 | Biological Process | response to auxin | ||||
| GO:0009737 | Biological Process | response to abscisic acid | ||||
| GO:0009751 | Biological Process | response to salicylic acid | ||||
| GO:0003677 | Molecular Function | DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 353 aa Download sequence Send to blast |
MGRSPCCDEN GLKKGPWTPE EDQILVDYIQ KHGHGSWRAL PKLAGLNRCG KSCRLRWTNY 60 LRPDIKRGKF SQEEEQTILH LHSILGNKWS AIATHLPGRT DNEIKNFWNT HLKKKLIQMG 120 IDPMTHQPRT DLFASLPQLI ALASLKDLMD RYNPLDEHVR LQAEAAQLAK LQYLQYLLQQ 180 STASLTSSND ITDQLDVLAL LNSIPHTKEE NNPHPTLLNS QEINNTPPAA SFSLGLGGSQ 240 PLHHPSQLSH LPDPPPVTFN FQTSSLNISD DYQVSQNSDF TTLVSQAADH YNPQPDCSWL 300 NLPSPTPPVI PPTLTETSLS NAGGVAESSF GGGSPYNWPE FGSEDPVMHG IS* |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 1a5j_A | 5e-30 | 12 | 116 | 5 | 108 | B-MYB |
| Search in ModeBase | ||||||
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Transcription factor that acts as negative regulator of lateral root (LR) development. Required for normal auxin responses during LR development. May be part of a negative feedback loop stimulated specifically in the endodermis upon LR initiation to ensure that LRs are formed only in the correct place. {ECO:0000269|PubMed:24902892}. | |||||
| Binding Motif ? help Back to Top | |||
|---|---|---|---|
| Motif ID | Method | Source | Motif file |
| MP00180 | DAP | Transfer from AT1G34670 | Download |
| |||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_36.134 |
| Regulation -- Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | INDUCTION: Induced by abscisic acid (ABA), auxin and gravity in roots. {ECO:0000269|PubMed:24902892}. | |||||
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | Retrieve | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021900768.1 | 0.0 | transcription factor MYB41 | ||||
| Swissprot | Q9S9Z2 | 1e-115 | MYB93_ARATH; Transcription factor MYB93 | ||||
| TrEMBL | A0A2N9F9B0 | 1e-152 | A0A2N9F9B0_FAGSY; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_36.134 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM4 | 28 | 2646 | Representative plant | OGRP5 | 17 | 1784 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT1G34670.1 | 1e-102 | myb domain protein 93 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_36.134 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




