![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_36.180 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | HD-ZIP | ||||||||
| Protein Properties | Length: 269aa MW: 30760.1 Da PI: 5.0328 | ||||||||
| Description | HD-ZIP family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | Homeobox | 60.1 | 3.5e-19 | 59 | 112 | 3 | 56 |
--SS--HHHHHHHHHHHHHSSS--HHHHHHHHHHCTS-HHHHHHHHHHHHHHHH CS
Homeobox 3 kRttftkeqleeLeelFeknrypsaeereeLAkklgLterqVkvWFqNrRakek 56
k++++t +q+++Le+ Fe+++++ e++ +LA++lgL+ rqV +WFqNrRa++k
evm.model.supercontig_36.180 59 KKRRLTLDQVKALEKNFEMENKLEPERKMKLAEELGLQPRQVAIWFQNRRARWK 112
566899***********************************************9 PP
| |||||||
| 2 | HD-ZIP_I/II | 130.9 | 4.9e-42 | 58 | 150 | 1 | 93 |
HD-ZIP_I/II 1 ekkrrlskeqvklLEesFeeeekLeperKvelareLglqprqvavWFqnrRARtktkqlEkdyeaLkraydalkeenerLe 81
ekkrrl+ +qvk+LE++Fe+e+kLeperK++la+eLglqprqva+WFqnrRAR+ktkqlEkdy Lk++ydalk++ ++Le
evm.model.supercontig_36.180 58 EKKRRLTLDQVKALEKNFEMENKLEPERKMKLAEELGLQPRQVAIWFQNRRARWKTKQLEKDYGLLKANYDALKNDYSSLE 138
69******************************************************************************* PP
HD-ZIP_I/II 82 keveeLreelke 93
+e+e+L+++lke
evm.model.supercontig_36.180 139 QEKEALTSKLKE 150
*********997 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SuperFamily | SSF46689 | 5.56E-20 | 45 | 116 | IPR009057 | Homeodomain-like |
| PROSITE profile | PS50071 | 17.767 | 54 | 114 | IPR001356 | Homeobox domain |
| SMART | SM00389 | 1.0E-17 | 57 | 118 | IPR001356 | Homeobox domain |
| Pfam | PF00046 | 2.1E-16 | 59 | 112 | IPR001356 | Homeobox domain |
| CDD | cd00086 | 1.58E-16 | 59 | 115 | No hit | No description |
| Gene3D | G3DSA:1.10.10.60 | 2.5E-20 | 61 | 121 | IPR009057 | Homeodomain-like |
| PRINTS | PR00031 | 7.2E-6 | 85 | 94 | IPR000047 | Helix-turn-helix motif |
| PROSITE pattern | PS00027 | 0 | 89 | 112 | IPR017970 | Homeobox, conserved site |
| PRINTS | PR00031 | 7.2E-6 | 94 | 110 | IPR000047 | Helix-turn-helix motif |
| Pfam | PF02183 | 6.0E-15 | 114 | 155 | IPR003106 | Leucine zipper, homeobox-associated |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| GO:0043565 | Molecular Function | sequence-specific DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 269 aa Download sequence Send to blast |
MERLGSSDSL TALISIFPPK EEKSKQSKQG YSSEFQAMLD SFIEEDYLEE VSHGGSTEKK 60 RRLTLDQVKA LEKNFEMENK LEPERKMKLA EELGLQPRQV AIWFQNRRAR WKTKQLEKDY 120 GLLKANYDAL KNDYSSLEQE KEALTSKLKE LKAKLKEGQA ESSNSFRQDC QILSVQSQEG 180 SDLCSREIVK EETDNINGGS SSFHDFNCSS SSNQWSEQFH IQNSRMGFGH SSSQFVKIEE 240 QSLFPADESC NFFSVDQAPT LQWYFAGH* |
| Nucleic Localization Signal ? help Back to Top | |||
|---|---|---|---|
| No. | Start | End | Sequence |
| 1 | 106 | 114 | RRARWKTKQ |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_36.180 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021900675.1 | 0.0 | homeobox-leucine zipper protein ATHB-6-like isoform X1 | ||||
| TrEMBL | A0A1R3K2I6 | 1e-100 | A0A1R3K2I6_9ROSI; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_36.180 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM545 | 28 | 143 | Representative plant | OGRP129 | 16 | 189 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT4G40060.1 | 6e-54 | homeobox protein 16 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_36.180 |




