![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_38.79 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | ERF | ||||||||
| Protein Properties | Length: 186aa MW: 20723.9 Da PI: 5.2192 | ||||||||
| Description | ERF family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | AP2 | 63.7 | 3.9e-20 | 19 | 68 | 2 | 55 |
AP2 2 gykGVrwdkkrgrWvAeIrdpsengkr.krfslgkfgtaeeAakaaiaarkkleg 55
+y+GVr+++ +g+W+AeIrdp+ + +r++lg+f tae+Aa a+++a++k++g
evm.model.supercontig_38.79 19 HYRGVRQRP-WGKWAAEIRDPK----KaARVWLGTFETAEDAALAYDRAALKFKG 68
7********.**********94....45************************988 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| Gene3D | G3DSA:3.30.730.10 | 1.2E-33 | 18 | 77 | IPR001471 | AP2/ERF domain |
| SMART | SM00380 | 6.8E-39 | 19 | 82 | IPR001471 | AP2/ERF domain |
| CDD | cd00018 | 6.52E-34 | 19 | 78 | No hit | No description |
| SuperFamily | SSF54171 | 6.54E-23 | 19 | 77 | IPR016177 | DNA-binding domain |
| Pfam | PF00847 | 9.7E-14 | 19 | 68 | IPR001471 | AP2/ERF domain |
| PROSITE profile | PS51032 | 24.764 | 19 | 76 | IPR001471 | AP2/ERF domain |
| PRINTS | PR00367 | 6.0E-12 | 20 | 31 | IPR001471 | AP2/ERF domain |
| PRINTS | PR00367 | 6.0E-12 | 42 | 58 | IPR001471 | AP2/ERF domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0009414 | Biological Process | response to water deprivation | ||||
| GO:0009651 | Biological Process | response to salt stress | ||||
| GO:0009723 | Biological Process | response to ethylene | ||||
| GO:0009737 | Biological Process | response to abscisic acid | ||||
| GO:0009751 | Biological Process | response to salicylic acid | ||||
| GO:0009753 | Biological Process | response to jasmonic acid | ||||
| GO:0045893 | Biological Process | positive regulation of transcription, DNA-templated | ||||
| GO:0071497 | Biological Process | cellular response to freezing | ||||
| GO:0003677 | Molecular Function | DNA binding | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 186 aa Download sequence Send to blast |
MALLYIYDHV CEDQSMRRHY RGVRQRPWGK WAAEIRDPKK AARVWLGTFE TAEDAALAYD 60 RAALKFKGNK AKLNFPELVQ AGNTELTAFT PVADITTTAT TTVMANQNPV DVADSQEPWS 120 QVSYQQDLLR YAQLLTGDVD LSYYTSNIMA DQPLPPHLSS SSSSSQHQNQ DQQGKSFDDD 180 NPAGH* |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 2gcc_A | 4e-29 | 18 | 82 | 4 | 69 | ATERF1 |
| 3gcc_A | 4e-29 | 18 | 82 | 4 | 69 | ATERF1 |
| Search in ModeBase | ||||||
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Transcriptional activator involved in the regulation of plant development and tolerance to abiotic stresses (PubMed:21069430). Acts as positive regulator of tolerance to waterlogging stress. Delays waterlogging-induced premature senescence by regulating stomatal closure and antioxidant enzyme activity. May function through ABI1-mediated abscisic acid (ABA) signaling pathway (PubMed:22661072). Involved in tissue reunion of wounded inflorescence stems. Required for the division of pith cells in the reunion process, which is dependent on polar-transported auxin and the wound-inducible hormones ethylene and jasmonate (PubMed:21911380). Binds to the GCC-box pathogenesis-related promoter element. May be involved in the regulation of gene expression by stress factors and by components of stress signal transduction pathways (By similarity). {ECO:0000250, ECO:0000269|PubMed:21069430, ECO:0000269|PubMed:21911380, ECO:0000269|PubMed:22661072}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_38.79 |
| Regulation -- Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | INDUCTION: Induced by salt stress (PubMed:16133218, PubMed:21069430). Induced drought stress, jasmonate (JA), salicylic acid (SA), abscisic acid (ABA) and ethylene. Down-regulated by freezing stress (PubMed:21069430). Induced by wounding in the flowering stem (PubMed:21911380). Induced by waterlogging. {ECO:0000269|PubMed:16133218, ECO:0000269|PubMed:21069430, ECO:0000269|PubMed:21911380}. | |||||
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021900277.1 | 1e-128 | ethylene-responsive transcription factor ERF113 | ||||
| Swissprot | Q9LYU3 | 3e-48 | EF113_ARATH; Ethylene-responsive transcription factor ERF113 | ||||
| TrEMBL | A0A061EBF0 | 3e-58 | A0A061EBF0_THECC; AP2 6l, putative | ||||
| STRING | evm.model.supercontig_38.79 | 1e-137 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM10 | 28 | 1650 | Representative plant | OGRP6 | 16 | 1718 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT5G13330.1 | 5e-39 | related to AP2 6l | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_38.79 |




