![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_39.3 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | C3H | ||||||||
| Protein Properties | Length: 318aa MW: 36349.6 Da PI: 7.4041 | ||||||||
| Description | C3H family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | zf-CCCH | 38.4 | 2e-12 | 85 | 111 | 1 | 27 |
--S---SGGGGTS--TTTTT-SS-SSS CS
zf-CCCH 1 yktelCrffartGtCkyGdrCkFaHgp 27
+++++C+f+++tG Ck+G+ C+F+H++
evm.model.supercontig_39.3 85 PGQPECQFYMKTGDCKFGAVCRFHHPR 111
5789*********************96 PP
| |||||||
| 2 | zf-CCCH | 40.3 | 5.4e-13 | 132 | 157 | 2 | 27 |
-S---SGGGGTS--TTTTT-SS-SSS CS
zf-CCCH 2 ktelCrffartGtCkyGdrCkFaHgp 27
+++lC f++r+G+Ck+G++CkF H++
evm.model.supercontig_39.3 132 GEPLCIFYSRYGICKFGPSCKFDHPM 157
789*********************95 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SMART | SM00356 | 7.8E-6 | 84 | 111 | IPR000571 | Zinc finger, CCCH-type |
| PROSITE profile | PS50103 | 14.596 | 84 | 112 | IPR000571 | Zinc finger, CCCH-type |
| Pfam | PF00642 | 6.3E-9 | 86 | 111 | IPR000571 | Zinc finger, CCCH-type |
| SuperFamily | SSF90229 | 6.8E-6 | 88 | 114 | IPR000571 | Zinc finger, CCCH-type |
| Gene3D | G3DSA:4.10.1000.10 | 4.5E-5 | 90 | 112 | IPR000571 | Zinc finger, CCCH-type |
| SMART | SM00356 | 1.2E-6 | 130 | 157 | IPR000571 | Zinc finger, CCCH-type |
| PROSITE profile | PS50103 | 14.389 | 130 | 158 | IPR000571 | Zinc finger, CCCH-type |
| Pfam | PF00642 | 2.1E-10 | 132 | 157 | IPR000571 | Zinc finger, CCCH-type |
| SuperFamily | SSF90229 | 1.11E-5 | 133 | 157 | IPR000571 | Zinc finger, CCCH-type |
| Gene3D | G3DSA:4.10.1000.10 | 4.8E-4 | 135 | 155 | IPR000571 | Zinc finger, CCCH-type |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0046872 | Molecular Function | metal ion binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 318 aa Download sequence Send to blast |
MTVEEAYQIN REKVERTINA TRNLNDWEIS KYDDLLRILD SLQVKAAADQ AVWKLEKKEV 60 FTLRSYYRFL NARDDHRENV FPERPGQPEC QFYMKTGDCK FGAVCRFHHP RERLIPAPDC 120 VLSPIGLPLR QGEPLCIFYS RYGICKFGPS CKFDHPMGVF TYNFSASTSN DTPVRRLLGS 180 SSGTALNLSS EGLVEAGSTK PRRLSLSETR QMPSGDDNID TDLLNEEFLF QLHDHRIIGN 240 SNLLSLFCHA EKHGPNIGMS RKNWAFQNQR LQIREIIVMD ALQQLLIICA KYLEELIAVS 300 LICMYNGFLP KSWLCNS* |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_39.3 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Nucleotide ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | |||
| GenBank | AC216470 | 1e-45 | AC216470.1 Populus trichocarpa clone POP037-N11, complete sequence. | |||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Swissprot | Q9SWF9 | 8e-84 | ZFNL_PEA; Zinc finger CCCH domain-containing protein ZFN-like | ||||
| STRING | evm.model.supercontig_39.3 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM3389 | 28 | 64 | Representative plant | OGRP1247 | 17 | 50 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT3G02830.1 | 1e-59 | zinc finger protein 1 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_39.3 |




