![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_4.112 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | bHLH | ||||||||
| Protein Properties | Length: 361aa MW: 40010.1 Da PI: 7.1865 | ||||||||
| Description | bHLH family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | HLH | 28.9 | 2e-09 | 195 | 242 | 4 | 55 |
HHHHHHHHHHHHHHHHHHHHHCTSCCC...TTS-STCHHHHHHHHHHHHHHH CS
HLH 4 ahnerErrRRdriNsafeeLrellPkaskapskKlsKaeiLekAveYIksLq 55
+h+ +Er RR++i +++ L++l+P + +k Ka +L + ++Y++sLq
evm.model.supercontig_4.112 195 SHSLAERVRREKISERMKILQKLVPGC----DKVTGKALMLDEIINYVQSLQ 242
8*************************9....555*****************9 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SuperFamily | SSF47459 | 3.66E-17 | 189 | 258 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| CDD | cd00083 | 5.71E-11 | 189 | 246 | No hit | No description |
| PROSITE profile | PS50888 | 15.713 | 191 | 241 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene3D | G3DSA:4.10.280.10 | 9.9E-17 | 191 | 256 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Pfam | PF00010 | 1.1E-6 | 195 | 242 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| SMART | SM00353 | 2.0E-10 | 197 | 247 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0009739 | Biological Process | response to gibberellin | ||||
| GO:0046983 | Molecular Function | protein dimerization activity | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 361 aa Download sequence Send to blast |
MASFPYQLHH PFLLDSLLCL PNTTCSSSPP PPPPSMKLYT NNLMDEDHSS CFSQFDPPQD 60 SMKDTTPVIY DNSCVVLSDN EPSVTKKQST DSSTVVDGDQ VTQNLAPVLD KKRKTRNGST 120 LTSSGHHSKR VEYACTGLWL NQETGREGKS KRQKKCMSNG GEDRKEGKGE KKVADQQPPT 180 GYIHVRARRG QATDSHSLAE RVRREKISER MKILQKLVPG CDKVTGKALM LDEIINYVQS 240 LQNQVEFLSM KLASLNPVFY DFGVDLDAFM VKPERMGCVQ ECSPTQITAF ADATTTNFAP 300 ANNYSLLDAS SPAFFIQQPQ IRPHPQDNGN GLLWDAEEQR QKFLNPSGTG LANSNLCCFH 360 * |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_4.112 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021909011.1 | 0.0 | transcription factor bHLH137 isoform X1 | ||||
| Refseq | XP_021909012.1 | 0.0 | transcription factor bHLH137 isoform X1 | ||||
| Refseq | XP_021909013.1 | 0.0 | transcription factor bHLH137 isoform X1 | ||||
| Swissprot | Q93W88 | 2e-59 | BH137_ARATH; Transcription factor bHLH137 | ||||
| TrEMBL | A0A2C9UIY9 | 1e-110 | A0A2C9UIY9_MANES; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_4.112 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM8796 | 24 | 39 | Representative plant | OGRP58 | 16 | 313 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT5G50915.2 | 6e-55 | bHLH family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_4.112 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




