![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_4.50 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | C3H | ||||||||
| Protein Properties | Length: 449aa MW: 49524.4 Da PI: 4.9732 | ||||||||
| Description | C3H family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | zf-CCCH | 32.3 | 1.7e-10 | 153 | 178 | 2 | 27 |
-S---SGGGGTS--TTTTT-SS-SSS CS
zf-CCCH 2 ktelCrffartGtCkyGdrCkFaHgp 27
++ +C++++rtG CkyG C+++H++
evm.model.supercontig_4.50 153 GQTECKYYLRTGGCKYGKACRYNHSK 178
6789********************95 PP
| |||||||
| 2 | zf-CCCH | 40.3 | 5.3e-13 | 199 | 223 | 2 | 26 |
-S---SGGGGTS--TTTTT-SS-SS CS
zf-CCCH 2 ktelCrffartGtCkyGdrCkFaHg 26
++++C++++r+G CkyG++CkF+H+
evm.model.supercontig_4.50 199 GEKECPYYMRNGSCKYGANCKFNHP 223
6789********************9 PP
| |||||||
| 3 | zf-CCCH | 26.9 | 8.3e-09 | 333 | 359 | 1 | 27 |
--S---SGGGGTS--TTTTT-SS-SSS CS
zf-CCCH 1 yktelCrffartGtCkyGdrCkFaHgp 27
+++++C++f++tG Ck+ ++Ck++H++
evm.model.supercontig_4.50 333 PGQPECSYFLKTGDCKFKSNCKYHHPK 359
5789*********************96 PP
| |||||||
| 4 | zf-CCCH | 34.2 | 4.1e-11 | 381 | 404 | 3 | 26 |
S---SGGGGTS--TTTTT-SS-SS CS
zf-CCCH 3 telCrffartGtCkyGdrCkFaHg 26
+ C +++r+G+Ck+G+ CkF H+
evm.model.supercontig_4.50 381 QNVCTHYSRYGICKFGPACKFDHP 404
568********************8 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| PROSITE profile | PS50103 | 14.633 | 151 | 179 | IPR000571 | Zinc finger, CCCH-type |
| SMART | SM00356 | 3.1E-5 | 151 | 178 | IPR000571 | Zinc finger, CCCH-type |
| Pfam | PF00642 | 2.9E-8 | 153 | 178 | IPR000571 | Zinc finger, CCCH-type |
| SuperFamily | SSF90229 | 6.28E-6 | 154 | 179 | IPR000571 | Zinc finger, CCCH-type |
| Gene3D | G3DSA:4.10.1000.10 | 4.5E-5 | 157 | 178 | IPR000571 | Zinc finger, CCCH-type |
| PROSITE profile | PS50103 | 15.91 | 197 | 225 | IPR000571 | Zinc finger, CCCH-type |
| SMART | SM00356 | 8.3E-7 | 197 | 224 | IPR000571 | Zinc finger, CCCH-type |
| SuperFamily | SSF90229 | 2.35E-6 | 199 | 224 | IPR000571 | Zinc finger, CCCH-type |
| Pfam | PF00642 | 1.2E-10 | 199 | 223 | IPR000571 | Zinc finger, CCCH-type |
| Gene3D | G3DSA:4.10.1000.10 | 1.7E-5 | 203 | 222 | IPR000571 | Zinc finger, CCCH-type |
| PROSITE profile | PS50103 | 14.333 | 332 | 360 | IPR000571 | Zinc finger, CCCH-type |
| SMART | SM00356 | 2.8E-4 | 332 | 359 | IPR000571 | Zinc finger, CCCH-type |
| Pfam | PF00642 | 2.9E-6 | 334 | 359 | IPR000571 | Zinc finger, CCCH-type |
| SuperFamily | SSF90229 | 2.88E-5 | 336 | 360 | IPR000571 | Zinc finger, CCCH-type |
| SuperFamily | SSF90229 | 2.22E-6 | 376 | 404 | IPR000571 | Zinc finger, CCCH-type |
| PROSITE profile | PS50103 | 14.802 | 378 | 406 | IPR000571 | Zinc finger, CCCH-type |
| SMART | SM00356 | 1.2E-4 | 378 | 405 | IPR000571 | Zinc finger, CCCH-type |
| Pfam | PF00642 | 1.5E-8 | 381 | 404 | IPR000571 | Zinc finger, CCCH-type |
| Gene3D | G3DSA:4.10.1000.10 | 7.9E-4 | 383 | 403 | IPR000571 | Zinc finger, CCCH-type |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0046872 | Molecular Function | metal ion binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 449 aa Download sequence Send to blast |
MTDQSDQPPV SDPYKRNQSS TSNSDLDPPP PDPHNAAEDE PTLQLVQQLQ DLDFKEPADE 60 QPDGRDSNDE EEEDSKSEES DKNDNGDEDE TAIAGEGGDV DKMNERRRYL YPLRPQAEDC 120 AFYMKTGKLQ IWSQLQVSKE KVKEGEEQAE KPGQTECKYY LRTGGCKYGK ACRYNHSKAK 180 TSVASVLELN FLGLPIRQGE KECPYYMRNG SCKYGANCKF NHPDPTAVGG GDPSGYNNGG 240 SVSSPAPSQV SIGSWSSPRP LNETGPFIPM IFSPTHAVPS QNPEWNGYQA PVYPPERSMH 300 PPTAYLMNNP TTEASVYTHH QPQKLVDEFP ERPGQPECSY FLKTGDCKFK SNCKYHHPKN 360 RTVKTPSCAL SDKGLPLRPD QNVCTHYSRY GICKFGPACK FDHPIQPPSS IVSAVDQAAQ 420 FSGSQTTAEE VKVTADGNGS DASIQQHV* |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_4.50 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021908990.1 | 0.0 | LOW QUALITY PROTEIN: zinc finger CCCH domain-containing protein 67 | ||||
| Swissprot | Q9STM4 | 1e-138 | C3H43_ARATH; Zinc finger CCCH domain-containing protein 43 | ||||
| TrEMBL | A0A061FXU4 | 0.0 | A0A061FXU4_THECC; Zinc finger C-x8-C-x5-C-x3-H type family protein, putative | ||||
| STRING | evm.model.supercontig_4.50 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM4176 | 27 | 58 | Representative plant | OGRP9141 | 7 | 14 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT3G48440.1 | 1e-135 | C3H family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_4.50 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




