![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_403.1 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | Trihelix | ||||||||
| Protein Properties | Length: 346aa MW: 38176.3 Da PI: 9.9511 | ||||||||
| Description | Trihelix family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | trihelix | 51.2 | 3.4e-16 | 50 | 133 | 1 | 86 |
trihelix 1 rWtkqevlaLiearremeerlrrgklkkplWeevskkm....rergferspkqCkekwenlnkrykkikegekkrtsessst 78
+W++ v +L+ea+++++ +r+klk+++We+v++++ +++ ++++qCk+k+e+++kry+ + ++ + s+
evm.model.supercontig_403.1 50 EWSEGAVSCLLEAYENKWVLRNRAKLKGHDWEDVARYVsaraNSTKSPKTQTQCKNKIESMKKRYRSESATPDG------SS 125
5*************************************87777777888999***************9999987......46 PP
trihelix 79 cpyfdqle 86
+p++++l+
evm.model.supercontig_403.1 126 WPLYSRLD 133
99999986 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| Pfam | PF13837 | 3.3E-20 | 48 | 133 | No hit | No description |
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 346 aa Download sequence Send to blast |
MDKEISTTQD HHPTPSPSLL LPNSIKEDLS PRKPFSSSAT SGADRLKRDE WSEGAVSCLL 60 EAYENKWVLR NRAKLKGHDW EDVARYVSAR ANSTKSPKTQ TQCKNKIESM KKRYRSESAT 120 PDGSSWPLYS RLDLLLRGTA PPQPPPPPIS SHPAQAAPAP ALTSPPLVVL EPSAQVVVVS 180 QSPALPPTPA PPPAPVVGNA QNSHGSNGFD RLAKEDGDGT KFSDHEPDKI AMETDSSTPA 240 LYSDKEKLRS KKLKMKLEKK KRRRKEEWEI AESIRWLAEV VVRSEQARME TMKEIEKMRA 300 EAEAKRGEMD LKRTEIIAST QLEIAKIFAA TSKGSVDSSL RIGRS* |
| Nucleic Localization Signal ? help Back to Top | |||
|---|---|---|---|
| No. | Start | End | Sequence |
| 1 | 250 | 261 | KKLKMKLEKKKR |
| 2 | 258 | 263 | KKKRRR |
| 3 | 258 | 264 | KKKRRRK |
| 4 | 259 | 264 | KKRRRK |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_403.1 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021910206.1 | 0.0 | trihelix transcription factor ASIL1 | ||||
| TrEMBL | A0A1R3H2H5 | 1e-146 | A0A1R3H2H5_COCAP; Uncharacterized protein | ||||
| TrEMBL | A0A2C9W2Y8 | 1e-147 | A0A2C9W2Y8_MANES; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_403.1 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM9859 | 25 | 33 | Representative plant | OGRP4409 | 14 | 21 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT3G54390.1 | 1e-100 | sequence-specific DNA binding transcription factors | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_403.1 |




