![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_44.122 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | HSF | ||||||||
| Protein Properties | Length: 357aa MW: 41127.4 Da PI: 4.7706 | ||||||||
| Description | HSF family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | HSF_DNA-bind | 113.5 | 1.4e-35 | 32 | 124 | 2 | 103 |
HHHHHHHHHCTGGGTTTSEESSSSSEEEES-HHHHHHHTHHHHSTT--HHHHHHHHHHTTEEE---SSBTTTTXTTSEEEE CS
HSF_DNA-bind 2 FlkklyeiledeelkeliswsengnsfvvldeeefakkvLpkyFkhsnfaSFvRQLnmYgFkkvkdeekkskskekiweFk 82
Fl+k+y+i++d +++++isws+ +nsfvv+d+++fa ++LpkyFkh+nf+SFvRQLn+YgF+kv+ ++ weF+
evm.model.supercontig_44.122 32 FLTKTYDIVDDLSTNNIISWSRGNNSFVVWDPQTFAMSLLPKYFKHNNFSSFVRQLNTYGFRKVDPDR---------WEFA 103
9****************************************************************999.........**** PP
ESXXXXXXXXXXXXXXXXXXX CS
HSF_DNA-bind 83 hksFkkgkkellekikrkkse 103
+ F +g+k+ll++i+r+k++
evm.model.supercontig_44.122 104 SEGFLRGQKHLLKTIRRRKTS 124
******************987 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SMART | SM00415 | 8.2E-59 | 28 | 121 | IPR000232 | Heat shock factor (HSF)-type, DNA-binding |
| Gene3D | G3DSA:1.10.10.10 | 1.6E-37 | 28 | 121 | IPR011991 | Winged helix-turn-helix DNA-binding domain |
| SuperFamily | SSF46785 | 5.03E-34 | 28 | 121 | IPR011991 | Winged helix-turn-helix DNA-binding domain |
| Pfam | PF00447 | 6.5E-31 | 32 | 121 | IPR000232 | Heat shock factor (HSF)-type, DNA-binding |
| PRINTS | PR00056 | 2.7E-19 | 32 | 55 | IPR000232 | Heat shock factor (HSF)-type, DNA-binding |
| PRINTS | PR00056 | 2.7E-19 | 70 | 82 | IPR000232 | Heat shock factor (HSF)-type, DNA-binding |
| PROSITE pattern | PS00434 | 0 | 71 | 95 | IPR000232 | Heat shock factor (HSF)-type, DNA-binding |
| PRINTS | PR00056 | 2.7E-19 | 83 | 95 | IPR000232 | Heat shock factor (HSF)-type, DNA-binding |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0005634 | Cellular Component | nucleus | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| GO:0043565 | Molecular Function | sequence-specific DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 357 aa Download sequence Send to blast |
MNRQSRLKQE YSAAMDAPQP MAGLHDIGPP PFLTKTYDIV DDLSTNNIIS WSRGNNSFVV 60 WDPQTFAMSL LPKYFKHNNF SSFVRQLNTY GFRKVDPDRW EFASEGFLRG QKHLLKTIRR 120 RKTSQMQGSQ QALDPCVEVG RFGLDGEVDR LRRDKQALMV ELVKLRQQQQ TTKACLQDME 180 ERLVKTETKQ QQMMSFLARA MKNPSFVQQL LEQKERTRQL EDAIRKKRRR PIDQGPDNVI 240 IGELGQGGSE LENFVKLEPK EYGDMSELEV VSELDMLAMD MQGLDETQNN PQQQLMENTC 300 EELDGKRSKD KDQGFWEDLL DESMEEEMGL LGVEEENVDA LVEHLGYLGS SPDYRS* |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 2ldu_A | 6e-26 | 21 | 124 | 11 | 123 | Heat shock factor protein 1 |
| Search in ModeBase | ||||||
| Nucleic Localization Signal ? help Back to Top | |||
|---|---|---|---|
| No. | Start | End | Sequence |
| 1 | 213 | 226 | KERTRQLEDAIRKK |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Transcriptional activator that specifically binds DNA sequence 5'-AGAAnnTTCT-3' known as heat shock promoter elements (HSE). | |||||
| Binding Motif ? help Back to Top | |||
|---|---|---|---|
| Motif ID | Method | Source | Motif file |
| MP00371 | DAP | Transfer from AT3G22830 | Download |
| |||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_44.122 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | Retrieve | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021899585.1 | 0.0 | heat stress transcription factor A-6b isoform X1 | ||||
| Swissprot | Q9LUH8 | 1e-132 | HFA6B_ARATH; Heat stress transcription factor A-6b | ||||
| TrEMBL | A0A2C9W9T2 | 1e-171 | A0A2C9W9T2_MANES; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_44.122 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM1256 | 28 | 99 | Representative plant | OGRP96 | 17 | 233 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT3G22830.1 | 1e-128 | heat shock transcription factor A6B | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_44.122 |




