![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_48.15 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | bHLH | ||||||||
| Protein Properties | Length: 314aa MW: 35398.5 Da PI: 9.0297 | ||||||||
| Description | bHLH family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | HLH | 41.1 | 3.3e-13 | 125 | 176 | 1 | 55 |
CHHHHHHHHHHHHHHHHHHHHHHHCTSCCC...TTS-STCHHHHHHHHHHHHHHH CS
HLH 1 rrrahnerErrRRdriNsafeeLrellPkaskapskKlsKaeiLekAveYIksLq 55
+r++h ++Er+RR+++N+ ++ Lr+l+P++ + ++ + a+i A++++k+L+
evm.model.supercontig_48.15 125 QRMTHIAVERNRRKQMNEYLSVLRSLMPES---YVQRGDQASIIGGAINFVKELE 176
79****************************...9******************995 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| CDD | cd00083 | 5.34E-13 | 123 | 180 | No hit | No description |
| Gene3D | G3DSA:4.10.280.10 | 5.3E-13 | 123 | 180 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| PROSITE profile | PS50888 | 15.402 | 124 | 175 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| SuperFamily | SSF47459 | 1.57E-16 | 124 | 193 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Pfam | PF00010 | 1.8E-10 | 125 | 176 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| SMART | SM00353 | 2.0E-9 | 130 | 181 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0046983 | Molecular Function | protein dimerization activity | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 314 aa Download sequence Send to blast |
MALEAVVFQQ DQLFTGYTTR DLYNLFGAGN WSFDGHFGFA RDEQDQDRNF LQNQTENLDQ 60 QPPNSTVSQT QFNELHHPNS SSCSNQYGTI DGSNSSANPT NVSTITRSKR RRSKSRKNKE 120 EIENQRMTHI AVERNRRKQM NEYLSVLRSL MPESYVQRGD QASIIGGAIN FVKELEHRLQ 180 LLGSQKEITN PERSDSVAPF SEFFTFPQYS TSSSSTRGGL VTHNSVAMNE EEQAAHVIIP 240 NSTQCAIADI EVTMVESHAN LKIRSRRRPK QLLKVVSGLH AMRLTVLHLN VSTVDQTVLY 300 SLSVKVRLKM TVS* |
| Nucleic Localization Signal ? help Back to Top | |||
|---|---|---|---|
| No. | Start | End | Sequence |
| 1 | 125 | 136 | RMTHIAVERNRR |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_48.15 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021899054.1 | 0.0 | transcription factor bHLH94-like isoform X2 | ||||
| TrEMBL | A0A2N9ED09 | 1e-115 | A0A2N9ED09_FAGSY; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_48.15 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM14299 | 18 | 21 | Representative plant | OGRP253 | 15 | 131 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT1G72210.1 | 1e-68 | bHLH family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_48.15 |




