![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_489.5 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | bHLH | ||||||||
| Protein Properties | Length: 225aa MW: 25033.3 Da PI: 5.5055 | ||||||||
| Description | bHLH family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | HLH | 22.7 | 1.8e-07 | 160 | 204 | 6 | 55 |
HHHHHHHHHHHHHHHHHHHCTSCC.C...TTS-STCHHHHHHHHHHHHHHH CS
HLH 6 nerErrRRdriNsafeeLrellPk.askapskKlsKaeiLekAveYIksLq 55
+++ r RR++i ++ ++L +l+P K++ ae+ + A +Y+k+Lq
evm.model.supercontig_489.5 160 SIAARERRRKITEKTQKLAKLIPGgH------KMNTAEMFQAASKYVKYLQ 204
67889******************955......******************9 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| PROSITE profile | PS50888 | 11.681 | 154 | 203 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene3D | G3DSA:4.10.280.10 | 3.7E-10 | 157 | 210 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| CDD | cd00083 | 1.82E-8 | 157 | 207 | No hit | No description |
| SuperFamily | SSF47459 | 1.14E-10 | 158 | 219 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Pfam | PF00010 | 4.6E-5 | 160 | 204 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| SMART | SM00353 | 4.6E-8 | 160 | 209 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0046983 | Molecular Function | protein dimerization activity | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 225 aa Download sequence Send to blast |
MTGFQQVPFQ DFQLPPDDLL ASDCTHSSFS HLGSCNFIDP FLPDDPFHYS HQSSFPPEIL 60 ELECSFQYPK RQRTIHTNYY QPHVEQPSDF FNGYVPNPSS VPLPELFSLH ELPPPPPLMD 120 LQVPAVPSFF DTGKVVGGDD DDDDQNVKKA GNGVSLSAQS IAARERRRKI TEKTQKLAKL 180 IPGGHKMNTA EMFQAASKYV KYLQAQVGVL QLLSSLPQVT IMQA* |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_489.5 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021907490.1 | 1e-160 | transcription factor bHLH52-like | ||||
| TrEMBL | B9I0X7 | 1e-39 | B9I0X7_POPTR; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_489.5 | 1e-164 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM4547 | 25 | 52 | Representative plant | OGRP5969 | 12 | 19 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT1G30670.1 | 2e-19 | bHLH family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_489.5 |




