![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_49.112 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | bZIP | ||||||||
| Protein Properties | Length: 350aa MW: 39481.4 Da PI: 7.0275 | ||||||||
| Description | bZIP family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | bZIP_1 | 31.8 | 3.2e-10 | 63 | 103 | 3 | 40 |
XXCHHHCHHHHHHHHHHHHHHHHHHHHHHHH...HHHHHHH CS
bZIP_1 3 elkrerrkqkNReAArrsRqRKkaeieeLee...kvkeLea 40
+k +rr+++NReAAr+sR+RKka++++Le+ k ++Le+
evm.model.supercontig_49.112 63 NDKIQRRLAQNREAARKSRLRKKAYVQQLETsrlKLAQLEQ 103
6899**************************83333444444 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SMART | SM00338 | 3.8E-5 | 61 | 132 | IPR004827 | Basic-leucine zipper domain |
| Pfam | PF00170 | 3.6E-7 | 63 | 102 | IPR004827 | Basic-leucine zipper domain |
| PROSITE profile | PS50217 | 9.197 | 63 | 107 | IPR004827 | Basic-leucine zipper domain |
| SuperFamily | SSF57959 | 6.51E-7 | 64 | 107 | No hit | No description |
| CDD | cd14708 | 6.81E-21 | 65 | 117 | No hit | No description |
| Gene3D | G3DSA:1.20.5.170 | 2.1E-7 | 66 | 108 | No hit | No description |
| PROSITE pattern | PS00036 | 0 | 68 | 83 | IPR004827 | Basic-leucine zipper domain |
| Pfam | PF14144 | 1.1E-28 | 151 | 226 | IPR025422 | Transcription factor TGA like domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0042742 | Biological Process | defense response to bacterium | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| GO:0043565 | Molecular Function | sequence-specific DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 350 aa Download sequence Send to blast |
MGIYEPFHSM STWANNFKDN DSPNTGSSTV VQMDARLDNK SSEYVSPEPG EPSRNDHEAN 60 RANDKIQRRL AQNREAARKS RLRKKAYVQQ LETSRLKLAQ LEQELERARQ QGLYIGGISD 120 TNYLGMSATV NSGIAAFEME YVHWVDEQHR QISELRNALQ AHITDIELRI LVKSGLNHYS 180 NLFRMKADAA KVDVFYLISG MWRTSTERFF QWIGGFRPSE LLNVVTPQLE PLTDQQIVDI 240 CNLRQSSQQA EDALSQGVDK LQQTLAQCMA AEPGGTGNYG SQMAAAMENL EALEGFVNQA 300 DHLRQQTLQH MSRVLTIRQA ARGLLALGEY FHRLRALSSL WAARPREPA* |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Transcriptional activator that binds specifically to the DNA sequence 5'-TGACG-3'. Recognizes ocs elements like the as-1 motif of the cauliflower mosaic virus 35S promoter. Binding to the as-1-like cis elements mediate auxin- and salicylic acid-inducible transcription. May be involved in the induction of the systemic acquired resistance (SAR) via its interaction with NPR1 (By similarity). {ECO:0000250, ECO:0000269|PubMed:12953119}. | |||||
| Binding Motif ? help Back to Top | |||
|---|---|---|---|
| Motif ID | Method | Source | Motif file |
| MP00247 | DAP | Transfer from AT1G77920 | Download |
| |||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_49.112 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | - | Retrieve | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021898560.1 | 0.0 | transcription factor TGA3 | ||||
| Refseq | XP_021898562.1 | 0.0 | transcription factor TGA3 | ||||
| Refseq | XP_021898563.1 | 0.0 | transcription factor TGA3 | ||||
| Refseq | XP_021898564.1 | 0.0 | transcription factor TGA3 | ||||
| Swissprot | Q93ZE2 | 1e-169 | TGA7_ARATH; Transcription factor TGA7 | ||||
| TrEMBL | A0A061FFL9 | 0.0 | A0A061FFL9_THECC; BZIP transcription factor family protein | ||||
| STRING | evm.model.supercontig_49.112 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM3061 | 27 | 66 | Representative plant | OGRP2679 | 11 | 32 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT1G77920.1 | 1e-150 | bZIP family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_49.112 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




