![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_49.26 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | bZIP | ||||||||
| Protein Properties | Length: 169aa MW: 18695.3 Da PI: 11.0857 | ||||||||
| Description | bZIP family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | bZIP_1 | 50.7 | 3.8e-16 | 90 | 141 | 5 | 56 |
CHHHCHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH CS
bZIP_1 5 krerrkqkNReAArrsRqRKkaeieeLeekvkeLeaeNkaLkkeleelkkev 56
+r+rr++kNRe+A rsR+RK+a++ eLe +v++L++eN++L+k+ e++ ++
evm.model.supercontig_49.26 90 RRQRRMIKNRESAARSRARKQAYTMELEAEVAKLKEENEELQKKQEKIMEMQ 141
79******************************************99999886 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| Gene3D | G3DSA:1.20.5.170 | 9.4E-16 | 84 | 138 | No hit | No description |
| SMART | SM00338 | 6.5E-14 | 86 | 151 | IPR004827 | Basic-leucine zipper domain |
| PROSITE profile | PS50217 | 11.496 | 88 | 139 | IPR004827 | Basic-leucine zipper domain |
| SuperFamily | SSF57959 | 4.5E-12 | 90 | 139 | No hit | No description |
| CDD | cd14707 | 4.82E-24 | 90 | 144 | No hit | No description |
| Pfam | PF00170 | 4.2E-14 | 90 | 142 | IPR004827 | Basic-leucine zipper domain |
| PROSITE pattern | PS00036 | 0 | 93 | 108 | IPR004827 | Basic-leucine zipper domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| GO:0043565 | Molecular Function | sequence-specific DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 169 aa Download sequence Send to blast |
MATNFNLKNF GNEPLADGGT SGNRPLANVP LTRQPSGRAM GVGLLQTQLS SNGIGKNNGD 60 TSSVSPVPYA FNGGFRGRKC SGAVEKVVER RQRRMIKNRE SAARSRARKQ AYTMELEAEV 120 AKLKEENEEL QKKQEKIMEM QKNQVLEMLN GQRGSKLRCL RRTQTGPW* |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Involved in ABA and stress responses and acts as a positive component of glucose signal transduction. Functions as transcriptional activator in the ABA-inducible expression of rd29B. Binds specifically to the ABA-responsive element (ABRE) of the rd29B gene promoter. {ECO:0000269|PubMed:11005831, ECO:0000269|PubMed:15361142, ECO:0000269|PubMed:16284313, ECO:0000269|PubMed:16463099}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_49.26 |
| Regulation -- Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | INDUCTION: Up-regulated by drought, salt, abscisic acid (ABA), cold and glucose. {ECO:0000269|PubMed:10636868, ECO:0000269|PubMed:11005831, ECO:0000269|PubMed:15361142, ECO:0000269|PubMed:16284313, ECO:0000269|PubMed:16463099}. | |||||
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_012071654.1 | 5e-66 | ABSCISIC ACID-INSENSITIVE 5-like protein 5 | ||||
| Refseq | XP_018805792.1 | 7e-66 | PREDICTED: ABSCISIC ACID-INSENSITIVE 5-like protein 5 isoform X2 | ||||
| Refseq | XP_018805793.1 | 7e-66 | PREDICTED: ABSCISIC ACID-INSENSITIVE 5-like protein 5 isoform X2 | ||||
| Refseq | XP_020534831.1 | 5e-66 | ABSCISIC ACID-INSENSITIVE 5-like protein 5 | ||||
| Swissprot | Q9M7Q4 | 4e-56 | AI5L5_ARATH; ABSCISIC ACID-INSENSITIVE 5-like protein 5 | ||||
| TrEMBL | A0A067D5D2 | 1e-65 | A0A067D5D2_CITSI; Uncharacterized protein | ||||
| TrEMBL | A0A067GWQ2 | 3e-65 | A0A067GWQ2_CITSI; Uncharacterized protein | ||||
| TrEMBL | A0A067L1G8 | 1e-64 | A0A067L1G8_JATCU; Uncharacterized protein | ||||
| TrEMBL | A0A2I4DF73 | 2e-64 | A0A2I4DF73_JUGRE; ABSCISIC ACID-INSENSITIVE 5-like protein 5 isoform X2 | ||||
| STRING | evm.model.supercontig_49.26 | 1e-119 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM734 | 27 | 129 | Representative plant | OGRP10063 | 7 | 11 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT1G45249.1 | 6e-35 | abscisic acid responsive elements-binding factor 2 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_49.26 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




