![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_5.165 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | bZIP | ||||||||
| Protein Properties | Length: 467aa MW: 51580.9 Da PI: 7.8215 | ||||||||
| Description | bZIP family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | bZIP_1 | 31.1 | 5.1e-10 | 179 | 221 | 3 | 45 |
XXCHHHCHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH CS
bZIP_1 3 elkrerrkqkNReAArrsRqRKkaeieeLeekvkeLeaeNkaL 45
+ k rr+++NReAAr+sR+RKka++++Le +L++ ++L
evm.model.supercontig_5.165 179 DQKTLRRLAQNREAARKSRLRKKAYVQQLESSRLKLTQLEQEL 221
56889*************************9777777666555 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SMART | SM00338 | 4.7E-9 | 177 | 240 | IPR004827 | Basic-leucine zipper domain |
| PROSITE profile | PS50217 | 9.415 | 179 | 223 | IPR004827 | Basic-leucine zipper domain |
| Pfam | PF00170 | 4.0E-7 | 180 | 221 | IPR004827 | Basic-leucine zipper domain |
| CDD | cd14708 | 2.12E-21 | 181 | 233 | No hit | No description |
| SuperFamily | SSF57959 | 7.74E-7 | 181 | 224 | No hit | No description |
| Gene3D | G3DSA:1.20.5.170 | 1.6E-7 | 182 | 225 | No hit | No description |
| PROSITE pattern | PS00036 | 0 | 184 | 199 | IPR004827 | Basic-leucine zipper domain |
| Pfam | PF14144 | 3.3E-30 | 264 | 338 | IPR025422 | Transcription factor TGA like domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0009410 | Biological Process | response to xenobiotic stimulus | ||||
| GO:0009627 | Biological Process | systemic acquired resistance | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| GO:0043565 | Molecular Function | sequence-specific DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 467 aa Download sequence Send to blast |
MGSRTVNIGA KNDKAVTGMP SYIPSLPTSN QIGSEGNTIH TSRITEFGTF EQSLGYRIED 60 AIDLSRNSIF NQLKPSGQAV GADIQFNALN KALATTETNL PAAIVVSQTL LHKEPQPNLV 120 SVSVGHRENW AETSMADASP RTDTSTDDTD DKNQRLEREQ PAALMASDSS DRSKDKTADQ 180 KTLRRLAQNR EAARKSRLRK KAYVQQLESS RLKLTQLEQE LQRARQQGIF ISSSGDQSHS 240 MSGNGALAFD VEYARWLEEH NRLINELRAA VNSHAGDTEL RTIVDNVTAQ FDDIFRLKGI 300 AAKADVFHIL SGMWKTPAER CFMWIGGFRS SELLKLLLNQ LEPLTEQQLV SIYNLQQSSQ 360 QAEDALSQGM EALQQSLAET LANGSPGPSG SSGNVANYMG QMAMAMGKLG TLEGFLRQAD 420 NLRQQTLQQM HRILTTRQSA RALLAINDYF SRLRALSSLW LARPRE* |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Transcriptional activator that binds specifically to the DNA sequence 5'-TGACG-3'. Recognizes ocs elements like the as-1 motif of the cauliflower mosaic virus 35S promoter. Binding to the as-1-like cis elements mediate auxin- and salicylic acid-inducible transcription. | |||||
| Binding Motif ? help Back to Top | |||
|---|---|---|---|
| Motif ID | Method | Source | Motif file |
| MP00349 | DAP | Transfer from AT3G12250 | Download |
| |||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_5.165 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | Retrieve | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021908631.1 | 0.0 | transcription factor TGA2.3-like | ||||
| Swissprot | O24160 | 0.0 | TGA21_TOBAC; TGACG-sequence-specific DNA-binding protein TGA-2.1 | ||||
| TrEMBL | A0A061EV20 | 0.0 | A0A061EV20_THECC; TGACG motif-binding factor 6 isoform 1 | ||||
| STRING | evm.model.supercontig_5.165 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM667 | 28 | 133 | Representative plant | OGRP722 | 16 | 67 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT3G12250.5 | 1e-126 | TGACG motif-binding factor 6 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_5.165 |




