![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_5.51 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | bZIP | ||||||||
| Protein Properties | Length: 506aa MW: 55265.1 Da PI: 8.8185 | ||||||||
| Description | bZIP family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | bZIP_1 | 27.3 | 7.8e-09 | 158 | 220 | 1 | 63 |
XXXXCHHHCHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH CS
bZIP_1 1 ekelkrerrkqkNReAArrsRqRKkaeieeLeekvkeLeaeNkaLkkeleelkkevaklksev 63
eke +r rr NRe+Ar +R++a +eeL++k++ L eN +Lk e + ke+++l++ +
evm.model.supercontig_5.51 158 EKEERRIRRVLANRESARQTIRRRQALCEELTQKAADLARENVQLKMEKDLALKEYQSLETIN 220
78999*****************************************************99876 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| Gene3D | G3DSA:1.20.5.170 | 6.9E-6 | 155 | 223 | No hit | No description |
| Pfam | PF00170 | 1.4E-7 | 158 | 220 | IPR004827 | Basic-leucine zipper domain |
| SMART | SM00338 | 4.0E-10 | 158 | 222 | IPR004827 | Basic-leucine zipper domain |
| PROSITE profile | PS50217 | 9.864 | 160 | 223 | IPR004827 | Basic-leucine zipper domain |
| SuperFamily | SSF57959 | 1.69E-5 | 162 | 217 | No hit | No description |
| CDD | cd14702 | 7.19E-14 | 163 | 214 | No hit | No description |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| GO:0043565 | Molecular Function | sequence-specific DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 506 aa Download sequence Send to blast |
MHCERGLVLS TSSSSSPFNP PSSAGTSAED AADMVADRTE MEAAEALADM AQLAMREKPA 60 ESPAKWGSKG KRVRKRVKSE SSPSDSRLSL VDSAPPCPDL AEDQAGQSEQ KVQASRRNKS 120 TKLGKSEQDT ELGKQTPVVP RCTSTGSGRS RQNLTEAEKE ERRIRRVLAN RESARQTIRR 180 RQALCEELTQ KAADLARENV QLKMEKDLAL KEYQSLETIN KQLKAQISKA TKPEAGQAVE 240 QPPHLNISAS PSTTYPVMLF NQNPLQPLCW PSVVQASHPI QSQHGPPTAL VVPSGIPAQA 300 PGNLLLSQEQ ENPVKSNGPR TPIYIVPCPW FFPLPDHGNG LHLQSSSGMK NMHDENSVNN 360 SYSSVPSLKT ITGIENHISH SPTEKVKEET SSSTESKHAN DLNEVPAGFP HDGGSHYIGL 420 HPKEMMLAPL PQSSMGPPFT FKQENVFPSD YVGHVLTVFP EKNQGTVDYS SKKMVDTVAA 480 AEARKRRKEL TKIKNLNSRQ CRTPA* |
| Nucleic Localization Signal ? help Back to Top | |||
|---|---|---|---|
| No. | Start | End | Sequence |
| 1 | 483 | 488 | RKRRKE |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_5.51 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021908715.1 | 0.0 | light-inducible protein CPRF2 isoform X1 | ||||
| TrEMBL | A0A2H5MZ11 | 1e-152 | A0A2H5MZ11_CITUN; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_5.51 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM11211 | 24 | 28 | Representative plant | OGRP4569 | 13 | 18 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT1G19490.1 | 8e-62 | bZIP family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_5.51 |




