![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_5.66 | ||||||||
| Common Name | CBF1 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | ERF | ||||||||
| Protein Properties | Length: 177aa MW: 19827.2 Da PI: 4.8432 | ||||||||
| Description | ERF family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | AP2 | 53.8 | 4.6e-17 | 17 | 67 | 1 | 56 |
AP2 1 sgykGVrwdkkrgrWvAeIrdpsengkrkrfslgkfgtaeeAakaaiaarkklege 56
+ ykGVr+ ++g+Wv+e r+p +k+ r+++g+f ++e+Aa+a++ a+++l+ge
evm.model.supercontig_5.66 17 PVYKGVRR--RNGKWVCETREP---NKQSRIWVGTFSSPEMAARAHDVAALALRGE 67
68****85..47******8887...336**************************97 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| Pfam | PF00847 | 9.2E-13 | 17 | 67 | IPR001471 | AP2/ERF domain |
| PROSITE profile | PS51032 | 19.388 | 18 | 75 | IPR001471 | AP2/ERF domain |
| SMART | SM00380 | 2.2E-23 | 18 | 81 | IPR001471 | AP2/ERF domain |
| Gene3D | G3DSA:3.30.730.10 | 1.5E-25 | 18 | 76 | IPR001471 | AP2/ERF domain |
| SuperFamily | SSF54171 | 2.75E-16 | 18 | 77 | IPR016177 | DNA-binding domain |
| CDD | cd00018 | 5.34E-25 | 19 | 76 | No hit | No description |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0005634 | Cellular Component | nucleus | ||||
| GO:0003677 | Molecular Function | DNA binding | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 177 aa Download sequence Send to blast |
MQKRKAGRKK FQETRHPVYK GVRRRNGKWV CETREPNKQS RIWVGTFSSP EMAARAHDVA 60 ALALRGESSA SLNFPDEIRA LPRAKSSAIR DIQCAAMEAA EVFRNTGDSS SAINVHGDDD 120 QEDEGMVFLD EDEVFNMPAI LHSMAEGLIL APPSVQRECT WDDDMEDEVE LALWSY* |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Transcriptional activator that binds specifically to the DNA sequence 5'-[AG]CCGAC-3'. Binding to the C-repeat/DRE element mediates high salinity- and dehydration-inducible transcription (By similarity). {ECO:0000250}. | |||||
| UniProt | Transcriptional activator that binds specifically to the DNA sequence 5'-[AG]CCGAC-3'. Binding to the C-repeat/DRE element mediates high salinity- and dehydration-inducible transcription. {ECO:0000269|PubMed:17136305}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_5.66 |
| Regulation -- Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | INDUCTION: By calcium ion, methyl-jasmonate (MeJA), cold, drought, and high salinity stress. {ECO:0000269|PubMed:17136305}. | |||||
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Nucleotide ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | |||
| GenBank | JX047553 | 0.0 | JX047553.1 Carica papaya CBF/DREB1 transcription factor 1 (CBF1) mRNA, complete cds. | |||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021908755.1 | 1e-130 | dehydration-responsive element-binding protein 1F-like | ||||
| Swissprot | A2WZI4 | 3e-54 | DRE1F_ORYSI; Dehydration-responsive element-binding protein 1F | ||||
| Swissprot | Q8S9Z5 | 3e-54 | DRE1F_ORYSJ; Dehydration-responsive element-binding protein 1F | ||||
| TrEMBL | X2C082 | 1e-128 | X2C082_CARPA; CBF/DREB1 transcription factor 1 | ||||
| STRING | evm.model.supercontig_5.66 | 1e-129 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM355 | 28 | 187 | Representative plant | OGRP6 | 16 | 1718 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT4G25490.1 | 3e-42 | C-repeat/DRE binding factor 1 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_5.66 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




