![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_50.37 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | bHLH | ||||||||
| Protein Properties | Length: 599aa MW: 66090.6 Da PI: 5.5346 | ||||||||
| Description | bHLH family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | HLH | 14.4 | 6.8e-05 | 452 | 489 | 13 | 55 |
HHHHHHHHHHHHCTSCC.C...TTS-STCHHHHHHHHHHHHHHH CS
HLH 13 RdriNsafeeLrellPk.askapskKlsKaeiLekAveYIksLq 55
R+ i +++ eLrel+P+ + K s + Le+++++I Lq
evm.model.supercontig_50.37 452 RQLIQDRIKELRELVPNgS------KCSIDSLLERTIKHILFLQ 489
77899************55......888888***********98 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| Pfam | PF14215 | 6.4E-8 | 38 | 72 | IPR025610 | Transcription factor MYC/MYB N-terminal |
| CDD | cd00083 | 3.54E-4 | 433 | 489 | No hit | No description |
| PROSITE profile | PS50888 | 11.808 | 439 | 488 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| SuperFamily | SSF47459 | 6.28E-6 | 452 | 506 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene3D | G3DSA:4.10.280.10 | 1.3E-4 | 452 | 496 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0046983 | Molecular Function | protein dimerization activity | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 599 aa Download sequence Send to blast |
MLEVAYKQLR FTNLSSKPND LKCREEIKSR PRQKFDLTIV VVAVVPQGVV QLGSLNKVTE 60 DEKLVTHVRD VFYALQDPLV GHVKNLVQQS MKSSVSLSNL PAKTLASEVT DSLWSSAHPK 120 KTVEVACKPA GMEISMSESE EGANLLQPGG KVVNMKCENQ VEMNFISSGF YEGETSGWKD 180 LTVRSGHSLN LHSNNSITND ISLCDFALEA EKLKVDRTCF ASAILDSAVC DPVKMDGSES 240 YQDGMPSVAK SSNLKFQKDS EECKSLSKLS QLDSANLAFK YSAGWELLEA LGPAFQKQSN 300 YVDWEIDKAE SVTFTEMTEG MNSSQLTFES GSENLLEAVV ANICHSSSDV KSERSFCKSM 360 QSLLTTDEMA ESSGYTKHTI DSAGCPINQS HFIDGDMQQH SSEICGGLPS RGYSSTCPSS 420 CSEPLDMSSE RAKNSRKRAR PGENSRPRPR DRQLIQDRIK ELRELVPNGS KCSIDSLLER 480 TIKHILFLQS ITKHADELSK CSELKMHQRG TGSSSYEQGS TWAVEVGSHL KVCSIIVENL 540 NKTGQMLVQM LCEECSHFLE IAEAIKSLGL TILKGVTEAH GEKDMDMFYG LRYDSNFF* |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_50.37 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021898392.1 | 0.0 | transcription factor bHLH155 isoform X1 | ||||
| TrEMBL | A0A1R3I7A6 | 0.0 | A0A1R3I7A6_COCAP; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_50.37 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM2083 | 20 | 30 | Representative plant | OGRP9957 | 3 | 4 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT2G31280.1 | 1e-122 | conserved peptide upstream open reading frame 7 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_50.37 |




