![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_52.101 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | bZIP | ||||||||
| Protein Properties | Length: 458aa MW: 49199.7 Da PI: 5.8822 | ||||||||
| Description | bZIP family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | bZIP_1 | 49.5 | 9.4e-16 | 230 | 285 | 3 | 58 |
XXCHHHCHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH CS
bZIP_1 3 elkrerrkqkNReAArrsRqRKkaeieeLeekvkeLeaeNkaLkkeleelkkevak 58
++kr+rr+ +NRe+ArrsR+RK++ i eLe+ v +L e ++L k+l+ ++ ++++
evm.model.supercontig_52.101 230 DVKRARRMLSNRESARRSRRRKQEHINELETQVGQLRVEHSSLLKRLSDMNHKYDE 285
78******************************************999988887776 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SMART | SM00338 | 4.2E-19 | 228 | 292 | IPR004827 | Basic-leucine zipper domain |
| PROSITE profile | PS50217 | 11.243 | 230 | 285 | IPR004827 | Basic-leucine zipper domain |
| Pfam | PF00170 | 1.2E-13 | 231 | 284 | IPR004827 | Basic-leucine zipper domain |
| SuperFamily | SSF57959 | 1.41E-11 | 231 | 283 | No hit | No description |
| Gene3D | G3DSA:1.20.5.170 | 2.9E-12 | 232 | 283 | No hit | No description |
| PROSITE pattern | PS00036 | 0 | 235 | 250 | IPR004827 | Basic-leucine zipper domain |
| Pfam | PF12498 | 4.7E-23 | 299 | 419 | IPR020983 | Basic leucine-zipper, C-terminal |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0002240 | Biological Process | response to molecule of oomycetes origin | ||||
| GO:0009626 | Biological Process | plant-type hypersensitive response | ||||
| GO:0045893 | Biological Process | positive regulation of transcription, DNA-templated | ||||
| GO:2000693 | Biological Process | positive regulation of seed maturation | ||||
| GO:0005634 | Cellular Component | nucleus | ||||
| GO:0005737 | Cellular Component | cytoplasm | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| GO:0043565 | Molecular Function | sequence-specific DNA binding | ||||
| GO:0046982 | Molecular Function | protein heterodimerization activity | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 458 aa Download sequence Send to blast |
MNTVFSVEDF SDSFWSAPDL AVAAAEIMNR SQSEWALERF FEEMSTSAPT NAIASSSLQS 60 QPSISTAERA HDNDVVEIGK PADHDNHNRS SPSGPSLTAR VDSEEYRAFL KNKLDLACAA 120 VALRASSVKP EDLGTQTENQ QKEAAKQPVP IQSGSQAQDY DTVPKDLTAV CSSVVQSEPG 180 ASPISAPALS ATQPKLVQAR QATSGSSRED SDEDEIEGDM GTTENTDPAD VKRARRMLSN 240 RESARRSRRR KQEHINELET QVGQLRVEHS SLLKRLSDMN HKYDEAAVDN RILKADIETL 300 RAKVKMAEET VKRVTGINPL FLAKSNIPSA AMPFVSNPMD TSLVGAVARQ PNPNQFLNQP 360 VPSIAAGTIP HQRLDNSFTG SALVAPGVNP QSDFRGNNIT ETAPFRLAAA AGPMQKQIGP 420 SASGVQKHVC PGVNPAEAMA GWNSGLPHAA TKNNQKC* |
| Nucleic Localization Signal ? help Back to Top | |||
|---|---|---|---|
| No. | Start | End | Sequence |
| 1 | 244 | 251 | RRSRRRKQ |
| 2 | 246 | 251 | SRRRKQ |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Transcription factor that binds to the 5'-ACGT-3' box, especially present in G-box-like motif (5'-CCACGTGGCC-3'), ABRE elements, of seed storage protein (SSP) encoding gene promoters (e.g. At2S and CRU3) and promotes their expression in seeds when in complex with ABI3 and BZIP53. {ECO:0000269|PubMed:12657652, ECO:0000269|PubMed:19261733, ECO:0000269|PubMed:19531597}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_52.101 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021898089.1 | 0.0 | light-inducible protein CPRF2-like | ||||
| Swissprot | Q9M1G6 | 1e-70 | BZP25_ARATH; Basic leucine zipper 25 | ||||
| TrEMBL | A0A061DQA6 | 1e-148 | A0A061DQA6_THECC; BZIP transcription factor family protein, putative isoform 1 | ||||
| STRING | evm.model.supercontig_52.101 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM5848 | 26 | 45 | Representative plant | OGRP1839 | 16 | 39 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT3G54620.1 | 1e-69 | basic leucine zipper 25 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_52.101 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




