![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_52.97 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | bHLH | ||||||||
| Protein Properties | Length: 335aa MW: 35400.4 Da PI: 7.8037 | ||||||||
| Description | bHLH family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | HLH | 29.9 | 1e-09 | 157 | 201 | 5 | 54 |
HHHHHHHHHHHHHHHHHHHHCTSCC.C...TTS-STCHHHHHHHHHHHHHH CS
HLH 5 hnerErrRRdriNsafeeLrellPk.askapskKlsKaeiLekAveYIksL 54
h+++Er RR++i +++ L+el+P+ + K + a++L + v+Y+k L
evm.model.supercontig_52.97 157 HSIAERLRREKIAERIRALQELVPSvN------KTDRAAMLDEIVDYVKFL 201
99***********************55......****************98 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| CDD | cd00083 | 3.04E-11 | 150 | 206 | No hit | No description |
| SuperFamily | SSF47459 | 4.06E-15 | 150 | 211 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| PROSITE profile | PS50888 | 16.132 | 152 | 201 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene3D | G3DSA:4.10.280.10 | 4.1E-15 | 154 | 211 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Pfam | PF00010 | 4.2E-7 | 157 | 201 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| SMART | SM00353 | 7.2E-11 | 158 | 207 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0009567 | Biological Process | double fertilization forming a zygote and endosperm | ||||
| GO:0031347 | Biological Process | regulation of defense response | ||||
| GO:0046983 | Molecular Function | protein dimerization activity | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 335 aa Download sequence Send to blast |
MASNNPNEAA SDDFLEQILG LPNFASADTG LTGHDGGLGG TAASVPPMML QLSSSDGSAH 60 MTALTAGSGG AGAAAGFHTP VFPLGLSLEQ GKGGFLKPED ASGSGKRFRD DVVDGRGSSV 120 KNVFHGQPMP TTVPAAPHPP VMRPRVRARR GQATDPHSIA ERLRREKIAE RIRALQELVP 180 SVNKTDRAAM LDEIVDYVKF LRLQVKVLSM SRLGGAGAVA PLVTDIPLSS VEVIDYKNIK 240 MAVSPVIIRK LSLLFVKQDE TGEGGRSQPA WEKWSNDGTE RQVAKLMEEN VGAAMQFLQS 300 KALCIMPISL ATAIYHAQPP DTSSLVKPEA NPPP* |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Required for ovule fertilization. {ECO:0000269|PubMed:15634699}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_52.97 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021898024.1 | 0.0 | transcription factor UNE12 isoform X1 | ||||
| Swissprot | O22768 | 1e-138 | UNE12_ARATH; Transcription factor UNE12 | ||||
| TrEMBL | A0A2I4DYZ2 | 1e-164 | A0A2I4DYZ2_JUGRE; transcription factor UNE12-like | ||||
| STRING | evm.model.supercontig_52.97 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM1611 | 28 | 88 | Representative plant | OGRP58 | 16 | 313 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT4G02590.2 | 1e-124 | bHLH family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_52.97 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




