PlantTFDB
PlantRegMap/PlantTFDB v5.0
Plant Transcription Factor Database
Transcription Factor Information
Basic Information | Signature Domain | Sequence | 
Basic Information? help Back to Top
TF ID evm.model.supercontig_53.118
Organism
Taxonomic ID
Taxonomic Lineage
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
Family bHLH
Protein Properties Length: 347aa    MW: 38193.1 Da    PI: 6.5113
Description bHLH family protein
Gene Model
Gene Model ID Type Source Coding Sequence
evm.model.supercontig_53.118genomeASGPBView CDS
Signature Domain? help Back to Top
Signature Domain
No. Domain Score E-value Start End HMM Start HMM End
1HLH44.92.1e-14164210354
                                   HHHHHHHHHHHHHHHHHHHHHHCTSCCC...TTS-STCHHHHHHHHHHHHHH CS
                           HLH   3 rahnerErrRRdriNsafeeLrellPkaskapskKlsKaeiLekAveYIksL 54 
                                   ++h+e+ErrRR+riN+ +++Lr+llP+      +K +Ka+ L ++++++k+L
  evm.model.supercontig_53.118 164 KSHSEAERRRRERINNHLAKLRSLLPST-----TKTDKASLLAEVIQHVKEL 210
                                   79*************************9.....8****************99 PP

Protein Features ? help Back to Top
3D Structure
Database Entry ID E-value Start End InterPro ID Description
PROSITE profilePS5088816.907161210IPR011598Myc-type, basic helix-loop-helix (bHLH) domain
PfamPF000108.4E-12164210IPR011598Myc-type, basic helix-loop-helix (bHLH) domain
Gene3DG3DSA:4.10.280.108.4E-15165219IPR011598Myc-type, basic helix-loop-helix (bHLH) domain
SuperFamilySSF474591.27E-14165217IPR011598Myc-type, basic helix-loop-helix (bHLH) domain
SMARTSM003536.3E-13167216IPR011598Myc-type, basic helix-loop-helix (bHLH) domain
CDDcd000833.77E-5174213No hitNo description
Gene3DG3DSA:3.30.70.2602.6E-4246301No hitNo description
Gene Ontology ? help Back to Top
GO Term GO Category GO Description
GO:0046983Molecular Functionprotein dimerization activity
Sequence ? help Back to Top
Protein Sequence    Length: 347 aa     Download sequence    Send to blast
MCAKKEDDQG ECSQAMIHNM QGFQEQLLLH QQQQGNDIYG ITGTRAGAGG GFLFPHEVPP  60
ILPWSLPPVH SFNPTHFSPN QPGDHDPFLV PPPPPPPPIS SYGSLFNRRA HGLQFAYDGT  120
PSTDHLRIIS EMVQPGGGPF GLQSELGKLT AQEIMDAKAL AASKSHSEAE RRRRERINNH  180
LAKLRSLLPS TTKTDKASLL AEVIQHVKEL KRQTSLIAET SPVPTEVDEL TVDASDEDGK  240
FIIKASLCCE DRSDLLPDLI KTLKALRLRT LKAEITTLGG RVKNVLFITG EDDSNDQQQQ  300
QQQQYCISSI QEALKAVMEK SSSDESSSGN VKRQRTNINI IEHRSL*
Nucleic Localization Signal ? help Back to Top
NLS
No. Start End Sequence
1169174ERRRRE
Cis-element ? help Back to Top
SourceLink
PlantRegMapevm.model.supercontig_53.118
Regulation -- PlantRegMap ? help Back to Top
Source Upstream Regulator Target Gene
PlantRegMapRetrieve-
Annotation -- Protein ? help Back to Top
Source Hit ID E-value Description
RefseqXP_021897825.10.0transcription factor bHLH30
SwissprotQ9S7Y11e-110BH030_ARATH; Transcription factor bHLH30
TrEMBLA0A0B0N1U51e-173A0A0B0N1U5_GOSAR; Transcription factor bHLH30-like protein
STRINGevm.model.supercontig_53.1180.0(Carica papaya)
Orthologous Group ? help Back to Top
LineageOrthologous Group IDTaxa NumberGene Number
MalvidsOGEM70482843
Representative plantOGRP37715106
Best hit in Arabidopsis thaliana ? help Back to Top
Hit ID E-value Description
AT1G68810.13e-86bHLH family protein
Publications ? help Back to Top
  1. Skinner MK,Rawls A,Wilson-Rawls J,Roalson EH
    Basic helix-loop-helix transcription factor gene family phylogenetics and nomenclature.
    Differentiation, 2010. 80(1): p. 1-8
    [PMID:20219281]
  2. Ohashi-Ito K, et al.
    A bHLH complex activates vascular cell division via cytokinin action in root apical meristem.
    Curr. Biol., 2014. 24(17): p. 2053-8
    [PMID:25131670]
  3. Katayama H, et al.
    A Negative Feedback Loop Controlling bHLH Complexes Is Involved in Vascular Cell Division and Differentiation in the Root Apical Meristem.
    Curr. Biol., 2015. 25(23): p. 3144-50
    [PMID:26616019]