![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_545.3 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | HD-ZIP | ||||||||
| Protein Properties | Length: 841aa MW: 91901.6 Da PI: 6.3469 | ||||||||
| Description | HD-ZIP family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | Homeobox | 57.3 | 2.6e-18 | 24 | 82 | 3 | 57 |
--SS--HHHHHHHHHHHHHSSS--HHHHHHHHHHC....TS-HHHHHHHHHHHHHHHHC CS
Homeobox 3 kRttftkeqleeLeelFeknrypsaeereeLAkkl....gLterqVkvWFqNrRakekk 57
k ++t+eq+e+Le++++++++ps +r++L +++ +++ +q+kvWFqNrR +ek+
evm.model.supercontig_545.3 24 KYVRYTAEQVEALERVYAECPKPSSLRRQQLIRECpilsNIEPKQIKVWFQNRRCREKQ 82
5679*****************************************************97 PP
| |||||||
| 2 | START | 157.7 | 9.1e-50 | 162 | 369 | 2 | 204 |
HHHHHHHHHHHHHHHC-TT-EEEEEXCCTTEEEEEEESSS.SCEEEEEEEECCSCHHHHHHHHHCCCGGCT-TT-SEEEEEE CS
START 2 laeeaaqelvkkalaeepgWvkssesengdevlqkfeeskvdsgealrasgvvdmvlallveellddkeqWdetlakaetle 83
+aee+++e+++ka+ ++ Wv+++ +++g++++ +f+ s+++sg a+ra+g+v +++ +e+l+d++ W +++++ e+
evm.model.supercontig_545.3 162 IAEETLAEFLSKATGTAVDWVQMPGMKPGPDSVGIFAISQSCSGVAARACGLVSLEPT-KIAEILKDRPSWFRDCRSLEVFT 242
7899******************************************************.7777777777***********99 PP
EECTT..EEEEEEEEXXTTXX-SSX.EEEEEEEEEEE.TTS-EEEEEEEEE-TTS--....-TTSEE-EESSEEEEEEEECT CS
START 84 vissg..galqlmvaelqalsplvp.RdfvfvRyirqlgagdwvivdvSvdseqkppe...sssvvRaellpSgiliepksn 159
g g+++l +++++a+++l+p Rdf+++Ry+ +l g++v++++S++ p+ +++vRae lpSg+li+p+++
evm.model.supercontig_545.3 243 MFPAGngGTIELVYTQTYAPTTLAPaRDFWTLRYTTSLDNGSLVVCERSLSGSGAGPNaaaAAQFVRAEILPSGYLIRPCEG 324
9999999********************************************99999998999******************** PP
CEEEEEEEE-EE--SSXXHHHHHHHHHHHHHHHHHHHHHHTXXXX CS
START 160 ghskvtwvehvdlkgrlphwllrslvksglaegaktwvatlqrqc 204
g+s +++v+h +l++++++++lr+l++s+ + ++k++ ++l++ +
evm.model.supercontig_545.3 325 GGSIIHIVDHLNLEAWSVPEVLRPLYESSKVVAQKMTISALRYIR 369
**************************************9998765 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| PROSITE profile | PS50071 | 15.321 | 19 | 83 | IPR001356 | Homeobox domain |
| SMART | SM00389 | 3.8E-15 | 21 | 87 | IPR001356 | Homeobox domain |
| SuperFamily | SSF46689 | 1.88E-16 | 22 | 86 | IPR009057 | Homeodomain-like |
| CDD | cd00086 | 4.77E-16 | 24 | 84 | No hit | No description |
| Pfam | PF00046 | 7.5E-16 | 25 | 82 | IPR001356 | Homeobox domain |
| Gene3D | G3DSA:1.10.10.60 | 2.9E-18 | 26 | 82 | IPR009057 | Homeodomain-like |
| CDD | cd14686 | 1.77E-6 | 76 | 115 | No hit | No description |
| PROSITE profile | PS50848 | 27.421 | 152 | 380 | IPR002913 | START domain |
| CDD | cd08875 | 2.24E-68 | 156 | 372 | No hit | No description |
| Gene3D | G3DSA:3.30.530.20 | 6.2E-20 | 161 | 352 | IPR023393 | START-like domain |
| SuperFamily | SSF55961 | 9.2E-35 | 161 | 373 | No hit | No description |
| SMART | SM00234 | 3.2E-41 | 161 | 371 | IPR002913 | START domain |
| Pfam | PF01852 | 2.9E-47 | 162 | 369 | IPR002913 | START domain |
| Pfam | PF08670 | 2.0E-51 | 696 | 839 | IPR013978 | MEKHLA |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0009855 | Biological Process | determination of bilateral symmetry | ||||
| GO:0009944 | Biological Process | polarity specification of adaxial/abaxial axis | ||||
| GO:0009956 | Biological Process | radial pattern formation | ||||
| GO:0010014 | Biological Process | meristem initiation | ||||
| GO:0010051 | Biological Process | xylem and phloem pattern formation | ||||
| GO:0010089 | Biological Process | xylem development | ||||
| GO:0030154 | Biological Process | cell differentiation | ||||
| GO:0005634 | Cellular Component | nucleus | ||||
| GO:0008289 | Molecular Function | lipid binding | ||||
| GO:0044212 | Molecular Function | transcription regulatory region DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 841 aa Download sequence Send to blast |
MAMAVAQHRE SSSGSINKHL DNGKYVRYTA EQVEALERVY AECPKPSSLR RQQLIRECPI 60 LSNIEPKQIK VWFQNRRCRE KQRKEASRLQ TVNRKLTAMN KLLMEENDRL QKQVSQLVCE 120 NGYMRQQLQT ASAATDASCD SVVTTPQHSL KDATNPAGLL SIAEETLAEF LSKATGTAVD 180 WVQMPGMKPG PDSVGIFAIS QSCSGVAARA CGLVSLEPTK IAEILKDRPS WFRDCRSLEV 240 FTMFPAGNGG TIELVYTQTY APTTLAPARD FWTLRYTTSL DNGSLVVCER SLSGSGAGPN 300 AAAAAQFVRA EILPSGYLIR PCEGGGSIIH IVDHLNLEAW SVPEVLRPLY ESSKVVAQKM 360 TISALRYIRQ IAQETSGEVV YGLGRQPAVL RTFSQRLSRG FNDAINGFND DGWTIMHCDG 420 AEDVILAVNS TKNLSTSANH ANSLTYLGGV LCAKASMLLQ NVPPAVLVRF LREHRSEWAD 480 FNVDAYSAAS LKAGSFAYPG MRPTRFTGSQ IIMPLGHTIE HEELLEVIRL EGHSLSQEDA 540 FVSRDIHLLQ ICSGIDENAV GACSELVFAP IDEMFPDDAP LLPSGFRIIP LDSKTSDPQD 600 TLNRHRTLDL TSSLEVGPAT NTSGDGSSCN NTRSVLTIAF QFPFESNLQE NVATMARQYV 660 RSVISSVQRV AMAISPTGLG PAVGPKLSPG SPEALTLAHW ICQSYSFHMG TELLRSDSAG 720 GDSVLKHLWH HPDAILCCSL KSLPVFIFAN QAGLDMLETT LVALQDITLD KIFDESGRKS 780 LCADFSKLMQ QGFAYLPAGI CMSTMGRHVS YEQAVAWKVL AAEENSVHCL AFSFVNWSFV 840 * |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Probable transcription factor involved in the regulation of interfascicular fiber (cortical cells) and secondary xylem differentiation in the inflorescence stems. Required for lateral shoot meristems (LSMs) and flower meristems (FMs) initiation. May be involved in the determination of vascular patterning and organ polarity (PubMed:10559440, PubMed:11169198, PubMed:11402186, PubMed:15111711, PubMed:15598805, PubMed:7555701). Directly regulates the expression of AGO10, ZPR1, ZPR2, ZPR3 and ZPR4 (PubMed:22781836). Required to regulate adaxial-abaxial polarity and leaf axial patterning (PubMed:20807212). {ECO:0000269|PubMed:10559440, ECO:0000269|PubMed:11169198, ECO:0000269|PubMed:11402186, ECO:0000269|PubMed:15111711, ECO:0000269|PubMed:15598805, ECO:0000269|PubMed:20807212, ECO:0000269|PubMed:22781836, ECO:0000269|PubMed:7555701}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_545.3 |
| Regulation -- Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | INDUCTION: By auxin. Repressed by ZPR and miR165. Induced by DOF5.1 (PubMed:20807212). {ECO:0000269|PubMed:15111711, ECO:0000269|PubMed:17237362, ECO:0000269|PubMed:20807212}. | |||||
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021905657.1 | 0.0 | homeobox-leucine zipper protein REVOLUTA | ||||
| Refseq | XP_021905664.1 | 0.0 | homeobox-leucine zipper protein REVOLUTA | ||||
| Swissprot | Q9SE43 | 0.0 | REV_ARATH; Homeobox-leucine zipper protein REVOLUTA | ||||
| TrEMBL | A0A2C9V1G8 | 0.0 | A0A2C9V1G8_MANES; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_545.3 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM4779 | 27 | 54 | Representative plant | OGRP651 | 16 | 71 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT5G60690.1 | 0.0 | HD-ZIP family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_545.3 |




