![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_55.31 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | MIKC_MADS | ||||||||
| Protein Properties | Length: 220aa MW: 24952.3 Da PI: 8.457 | ||||||||
| Description | MIKC_MADS family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | SRF-TF | 92.2 | 2.6e-29 | 9 | 59 | 1 | 51 |
S---SHHHHHHHHHHHHHHHHHHHHHHHHHHT-EEEEEEE-TTSEEEEEE- CS
SRF-TF 1 krienksnrqvtfskRrngilKKAeELSvLCdaevaviifsstgklyeyss 51
k+i+n++ rqvtfskRr g++KKAeELSvLCda+va+i+fsstgkl+eyss
evm.model.supercontig_55.31 9 KKIDNTTARQVTFSKRRRGLFKKAEELSVLCDADVALIVFSSTGKLFEYSS 59
68***********************************************96 PP
| |||||||
| 2 | K-box | 43.6 | 1.3e-15 | 95 | 172 | 22 | 99 |
K-box 22 akLkkeienLqreqRhllGedLesLslkeLqqLeqqLekslkkiRskKnellleqieelqkkekelqeenkaLrkkle 99
++L kei + ++++++ Ge+L+ Ls+++LqqLe+ Le +l+++ +kK + ++++i++lq+k +l een++Lr+++
evm.model.supercontig_55.31 95 SRLCKEIAEKSHQLKQMRGEELQGLSIEQLQQLEKSLEVGLRRVIEKKGQNIMKEISDLQRKGLRLVEENEKLRQQIS 172
67777788878899*************************************************************986 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SMART | SM00432 | 3.1E-40 | 1 | 60 | IPR002100 | Transcription factor, MADS-box |
| PROSITE profile | PS50066 | 30.628 | 1 | 61 | IPR002100 | Transcription factor, MADS-box |
| CDD | cd00265 | 6.93E-39 | 2 | 70 | No hit | No description |
| PROSITE pattern | PS00350 | 0 | 3 | 57 | IPR002100 | Transcription factor, MADS-box |
| PRINTS | PR00404 | 7.8E-28 | 3 | 23 | IPR002100 | Transcription factor, MADS-box |
| SuperFamily | SSF55455 | 7.19E-32 | 3 | 74 | IPR002100 | Transcription factor, MADS-box |
| Pfam | PF00319 | 2.6E-26 | 10 | 57 | IPR002100 | Transcription factor, MADS-box |
| PRINTS | PR00404 | 7.8E-28 | 23 | 38 | IPR002100 | Transcription factor, MADS-box |
| PRINTS | PR00404 | 7.8E-28 | 38 | 59 | IPR002100 | Transcription factor, MADS-box |
| PROSITE profile | PS51297 | 12.527 | 87 | 177 | IPR002487 | Transcription factor, K-box |
| Pfam | PF01486 | 1.4E-14 | 93 | 171 | IPR002487 | Transcription factor, K-box |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0009266 | Biological Process | response to temperature stimulus | ||||
| GO:0009910 | Biological Process | negative regulation of flower development | ||||
| GO:0010076 | Biological Process | maintenance of floral meristem identity | ||||
| GO:0010582 | Biological Process | floral meristem determinacy | ||||
| GO:0045892 | Biological Process | negative regulation of transcription, DNA-templated | ||||
| GO:0048438 | Biological Process | floral whorl development | ||||
| GO:0005634 | Cellular Component | nucleus | ||||
| GO:0016021 | Cellular Component | integral component of membrane | ||||
| GO:0000900 | Molecular Function | translation repressor activity, nucleic acid binding | ||||
| GO:0003677 | Molecular Function | DNA binding | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| GO:0046983 | Molecular Function | protein dimerization activity | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 220 aa Download sequence Send to blast |
MAREKIQIKK IDNTTARQVT FSKRRRGLFK KAEELSVLCD ADVALIVFSS TGKLFEYSSS 60 SMKEILERHR LHAKNLEKLE QPSLELQLVE NADRSRLCKE IAEKSHQLKQ MRGEELQGLS 120 IEQLQQLEKS LEVGLRRVIE KKGQNIMKEI SDLQRKGLRL VEENEKLRQQ ISNKGKQGGA 180 ESENVVYEEG QSSESVTNLC NSNGPPYDYE SSDTSLKLG* |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 5f28_A | 5e-21 | 1 | 69 | 1 | 69 | MEF2C |
| 5f28_B | 5e-21 | 1 | 69 | 1 | 69 | MEF2C |
| 5f28_C | 5e-21 | 1 | 69 | 1 | 69 | MEF2C |
| 5f28_D | 5e-21 | 1 | 69 | 1 | 69 | MEF2C |
| Search in ModeBase | ||||||
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Transcription repressor that inhibit floral transition in the autonomous flowering pathway, independent of photoperiod and temperature. Acts in a dosage-dependent manner. Together with AGL24 and AP1, controls the identity of the floral meristem and regulates expression of class B, C and E genes. Promotes EFM expression to suppress flowering (PubMed:25132385). {ECO:0000269|PubMed:16679456, ECO:0000269|PubMed:18694458, ECO:0000269|PubMed:19656343, ECO:0000269|PubMed:25132385}. | |||||
| Binding Motif ? help Back to Top | |||
|---|---|---|---|
| Motif ID | Method | Source | Motif file |
| MP00272 | DAP | Transfer from AT2G22540 | Download |
| |||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_55.31 |
| Regulation -- Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | INDUCTION: Repressed by the floral homeotic genes AP1 and SEP3 in emerging floral meristems. Up-regulated by HUA2. {ECO:0000269|PubMed:15659097, ECO:0000269|PubMed:17428825, ECO:0000269|PubMed:18694458}. | |||||
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | Retrieve | ||||
| Annotation -- Nucleotide ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | |||
| GenBank | LC049379 | 0.0 | LC049379.1 Carica papaya mRNA for MADS-box protein, complete cds, cultivar: TM1. | |||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021897604.1 | 1e-154 | MADS-box protein SVP | ||||
| Refseq | XP_021897605.1 | 1e-154 | MADS-box protein SVP | ||||
| Swissprot | Q9FVC1 | 1e-113 | SVP_ARATH; MADS-box protein SVP | ||||
| TrEMBL | A0A0F7QGF1 | 1e-135 | A0A0F7QGF1_CARPA; MADS-box protein | ||||
| STRING | evm.model.supercontig_55.31 | 1e-156 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM4190 | 27 | 47 | Representative plant | OGRP6076 | 11 | 20 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT2G22540.1 | 1e-116 | MIKC_MADS family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_55.31 |




