![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_55.51 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | bHLH | ||||||||
| Protein Properties | Length: 220aa MW: 24539.7 Da PI: 11.0672 | ||||||||
| Description | bHLH family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | HLH | 45.3 | 1.5e-14 | 55 | 101 | 3 | 54 |
HHHHHHHHHHHHHHHHHHHHHHCTSCCC...TTS-STCHHHHHHHHHHHHHH CS
HLH 3 rahnerErrRRdriNsafeeLrellPkaskapskKlsKaeiLekAveYIksL 54
++h+e+ErrRR riNs f+ Lr++lP++ +K++Ka++L +A++ + +L
evm.model.supercontig_55.51 55 KKHSEAERRRRFRINSQFAALRTILPNL-----TKMDKASVLGEAIQQVTQL 101
68*************************9.....9************977776 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| PROSITE profile | PS50888 | 15.866 | 52 | 101 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| CDD | cd00083 | 9.62E-11 | 55 | 106 | No hit | No description |
| Pfam | PF00010 | 3.4E-12 | 55 | 101 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene3D | G3DSA:4.10.280.10 | 2.3E-15 | 56 | 110 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| SuperFamily | SSF47459 | 1.83E-15 | 56 | 111 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| SMART | SM00353 | 1.4E-13 | 58 | 107 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| SuperFamily | SSF55021 | 9.61E-5 | 138 | 205 | No hit | No description |
| Gene3D | G3DSA:3.30.70.260 | 9.7E-5 | 139 | 205 | No hit | No description |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0046983 | Molecular Function | protein dimerization activity | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 220 aa Download sequence Send to blast |
MRQSASHYPP RTYTMRSSLF HGRVSNNAKQ CSFLNGILST KPAISKAEAL AIAAKKHSEA 60 ERRRRFRINS QFAALRTILP NLTKMDKASV LGEAIQQVTQ LKKTVKELEL DSCGKSKRLF 120 PCEQDSLNLK YCNKEKTLVK IAFSCEDRLA LISNITEALK STKGKILRAE MVIVGGRARH 180 VLWIQGFLGN EGIVRLKRML RAIMDSPSSP GNSKHRVSN* |
| Nucleic Localization Signal ? help Back to Top | |||
|---|---|---|---|
| No. | Start | End | Sequence |
| 1 | 60 | 65 | ERRRRF |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_55.51 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021897442.1 | 1e-149 | transcription factor bHLH131 | ||||
| TrEMBL | A0A067FBL5 | 5e-61 | A0A067FBL5_CITSI; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_55.51 | 1e-161 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM13939 | 20 | 25 | Representative plant | OGRP14910 | 3 | 4 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT4G38070.1 | 3e-41 | bHLH family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_55.51 |




