![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_57.21 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | WRKY | ||||||||
| Protein Properties | Length: 491aa MW: 53118.5 Da PI: 7.2774 | ||||||||
| Description | WRKY family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | WRKY | 98 | 5.9e-31 | 245 | 303 | 2 | 59 |
--SS-EEEEEEE--TT-SS-EEEEEE-ST.T---EEEEEE-SSSTTEEEEEEES--SS- CS
WRKY 2 dDgynWrKYGqKevkgsefprsYYrCtsa.gCpvkkkversaedpkvveitYegeHnhe 59
+Dg++WrKYGqK+ kg+++pr+YYrCt+a gCpv+k+v+r+a+d++++++tYeg+Hnh+
evm.model.supercontig_57.21 245 SDGCQWRKYGQKMAKGNPCPRAYYRCTMAvGCPVRKQVQRCADDKSILITTYEGNHNHP 303
7*********************************************************7 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| Gene3D | G3DSA:2.20.25.80 | 1.0E-33 | 229 | 305 | IPR003657 | WRKY domain |
| SuperFamily | SSF118290 | 3.4E-28 | 237 | 305 | IPR003657 | WRKY domain |
| PROSITE profile | PS50811 | 29.723 | 239 | 305 | IPR003657 | WRKY domain |
| SMART | SM00774 | 1.6E-37 | 244 | 304 | IPR003657 | WRKY domain |
| Pfam | PF03106 | 4.3E-27 | 246 | 303 | IPR003657 | WRKY domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| GO:0043565 | Molecular Function | sequence-specific DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 491 aa Download sequence Send to blast |
MDNNQLERRE FTFLHSSGDF LGQISGVPDD HKRPPVKEMD FFSTSNQPPD QHTNIGSSSS 60 GVNIGLNLLT SGCRISRIEN DDRPNSELSS LQKELERLHE ENRKLRSTLD QITKKYSELQ 120 NQLVMTIQTQ GQGGRREQVL VQKGVSSPIK PGQELTEPRP LDVNEASVSD DKTQDLSNTM 180 EVVSKEREMN VVSGKQDGGD QTSQSWGSPK SPKSDQNKNE DQIPEAPFRK ARVSVRARSE 240 APMISDGCQW RKYGQKMAKG NPCPRAYYRC TMAVGCPVRK QVQRCADDKS ILITTYEGNH 300 NHPLPPAATA MASTTSAAAA MLLSGSTSTK ESLPTSAFLS SVPYASTMAT LSASAPFPTI 360 TLDLTQTPNP MHLLRSQTSF PLPLHGSPQL LGHPMFVAPH KFPAMPPLQL AQRPPSMVET 420 VTAAIASDPN FTAALAAAIS SIIGSNPRSN DANNGSNNVT DENINVTPNG VPGLPGSPQL 480 QQSCTTFSTN * |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 2ayd_A | 2e-21 | 231 | 307 | 1 | 76 | WRKY transcription factor 1 |
| Search in ModeBase | ||||||
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Transcription factor. Interacts specifically with the W box (5'-(T)TGAC[CT]-3'), a frequently occurring elicitor-responsive cis-acting element (By similarity). {ECO:0000250}. | |||||
| Binding Motif ? help Back to Top | |||
|---|---|---|---|
| Motif ID | Method | Source | Motif file |
| MP00115 | ampDAP | Transfer from AT4G01720 | Download |
| |||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_57.21 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | Retrieve | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021897275.1 | 0.0 | probable WRKY transcription factor 47 isoform X1 | ||||
| Swissprot | Q9ZSI7 | 1e-104 | WRK47_ARATH; Probable WRKY transcription factor 47 | ||||
| TrEMBL | A0A061DRV7 | 0.0 | A0A061DRV7_THECC; WRKY family transcription factor, putative | ||||
| STRING | evm.model.supercontig_57.21 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM7156 | 27 | 43 | Representative plant | OGRP14 | 17 | 875 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT4G01720.1 | 3e-92 | WRKY family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_57.21 |




