![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_58.61 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | CPP | ||||||||
| Protein Properties | Length: 478aa MW: 52054.5 Da PI: 6.425 | ||||||||
| Description | CPP family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | TCR | 29.1 | 1.9e-09 | 361 | 385 | 16 | 40 |
TCR 16 kYCeCfaagkkCseeCkCedCkNke 40
YCeCfaag++C e C+C dC+Nk
evm.model.supercontig_58.61 361 SYCECFAAGVYCIEPCSCLDCFNKP 385
6**********************96 PP
| |||||||
| 2 | TCR | 51.3 | 2.3e-16 | 432 | 470 | 1 | 39 |
TCR 1 kekkgCnCkkskClkkYCeCfaagkkCseeCkCedCkNk 39
++k+gCnCkks+ClkkYCeC++ g+ Cs +C+Ce+CkN
evm.model.supercontig_58.61 432 RHKRGCNCKKSSCLKKYCECYQGGVGCSINCRCEGCKNA 470
589***********************************7 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SMART | SM01114 | 3.3E-4 | 351 | 387 | IPR033467 | Tesmin/TSO1-like CXC domain |
| PROSITE profile | PS51634 | 31.568 | 352 | 472 | IPR005172 | CRC domain |
| Pfam | PF03638 | 2.7E-6 | 361 | 384 | IPR005172 | CRC domain |
| SMART | SM01114 | 2.9E-17 | 432 | 473 | IPR033467 | Tesmin/TSO1-like CXC domain |
| Pfam | PF03638 | 7.6E-12 | 434 | 470 | IPR005172 | CRC domain |
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 478 aa Download sequence Send to blast |
MRARPDSSSS SSLQMDTPEK IQIANPLSKF EVIGSSTLSN IMDSPVFNYI NNLSPIKPVK 60 SVHITQTFNS LTFASLPSVF TSPHVISHKE SRFFTRHISS DPPKPEFSSQ HHTKLGKNEA 120 VEDAGQLYDN SADLPKNFDP GVSIGEASTE APNEQSKFAI ELPRTLKYDC GSPDCDTIPC 180 VLETNNGKPH SNGASVSLVP FVRLDSEKVE ATNEATGCDW ESLISDAADL LIFSSPNDSE 240 AFKGLIQKPL DPDVKFSSLR SQVPQTMLTS VVVSSSSEPQ NEPSRTAEAS KLGDKVLENI 300 GNTCMNKCLH SNLTGQVNNE LTTSIPFPCE TVSNLHRGMR RRCLDFEMLA ARRKNFGDGS 360 SYCECFAAGV YCIEPCSCLD CFNKPIHEDT VLATRKQIES RNPLAFAPKV IRSSDSLPET 420 GDDSSKTPAS ARHKRGCNCK KSSCLKKYCE CYQGGVGCSI NCRCEGCKNA FGRKDGE* |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 5fd3_A | 9e-12 | 387 | 469 | 49 | 120 | Protein lin-54 homolog |
| 5fd3_B | 9e-12 | 387 | 469 | 49 | 120 | Protein lin-54 homolog |
| Search in ModeBase | ||||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_58.61 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021897055.1 | 0.0 | protein tesmin/TSO1-like CXC 2 | ||||
| TrEMBL | A0A2N9F508 | 1e-135 | A0A2N9F508_FAGSY; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_58.61 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM1467 | 28 | 91 | Representative plant | OGRP993 | 17 | 55 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT4G14770.1 | 3e-74 | TESMIN/TSO1-like CXC 2 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_58.61 |




