![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_6.121 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | ZF-HD | ||||||||
| Protein Properties | Length: 328aa MW: 37087.7 Da PI: 9.2637 | ||||||||
| Description | ZF-HD family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | ZF-HD_dimer | 108.8 | 3.1e-34 | 119 | 175 | 3 | 60 |
ZF-HD_dimer 3 kvrYkeClkNhAaslGghavDGCgEfmpsegeegtaaalkCaACgCHRnFHRreveee 60
v+Y+eClkNhAas+Ggh+vDGCgEfmps geeg+ ++lkCaAC+CHRnFHR+e + e
evm.model.supercontig_6.121 119 VVKYRECLKNHAASMGGHVVDGCGEFMPS-GEEGSLESLKCAACDCHRNFHRKEIDGE 175
589*************************9.999********************98865 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| ProDom | PD125774 | 7.0E-23 | 116 | 174 | IPR006456 | ZF-HD homeobox protein, Cys/His-rich dimerisation domain |
| Pfam | PF04770 | 2.3E-31 | 120 | 172 | IPR006456 | ZF-HD homeobox protein, Cys/His-rich dimerisation domain |
| TIGRFAMs | TIGR01566 | 3.4E-32 | 121 | 172 | IPR006456 | ZF-HD homeobox protein, Cys/His-rich dimerisation domain |
| PROSITE profile | PS51523 | 27.963 | 122 | 171 | IPR006456 | ZF-HD homeobox protein, Cys/His-rich dimerisation domain |
| SuperFamily | SSF46689 | 1.2E-18 | 247 | 318 | IPR009057 | Homeodomain-like |
| Gene3D | G3DSA:1.10.10.60 | 6.9E-28 | 252 | 322 | IPR009057 | Homeodomain-like |
| TIGRFAMs | TIGR01565 | 2.2E-26 | 261 | 318 | IPR006455 | Homeodomain, ZF-HD class |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0003677 | Molecular Function | DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 328 aa Download sequence Send to blast |
MGIPSYNSPV AERRRGDHHH HHHHHHPVHG DSVVFQPHQT LDHHHHHLLR HDQLQYVNHQ 60 QIHNTPRRDP DPEPELDPDR VPTSSPTSSK SNQDSPPRAP QRPSPTPAAI DSAAPAPVVV 120 KYRECLKNHA ASMGGHVVDG CGEFMPSGEE GSLESLKCAA CDCHRNFHRK EIDGETPRRN 180 NTIILPPPHL QPHQLPQLYH HRHHHRLISQ GLLPSPSLPA GPLPPMMMNF GGGGTAAESS 240 SEDLNMLQSN NNTVGKTSRS KKRFRTKFSQ EQKDKMLEFA EKLGWKIQKQ DEKEVQQFCS 300 QVNVTKQVFK VWMHNNKQVV LKKKQIM* |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 1wh7_A | 2e-21 | 260 | 317 | 16 | 73 | ZF-HD homeobox family protein |
| Search in ModeBase | ||||||
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Putative transcription factor. | |||||
| Binding Motif ? help Back to Top | |||
|---|---|---|---|
| Motif ID | Method | Source | Motif file |
| MP00268 | DAP | Transfer from AT2G18350 | Download |
| |||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_6.121 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | Retrieve | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021907866.1 | 0.0 | zinc-finger homeodomain protein 6-like, partial | ||||
| Swissprot | Q9ZPW7 | 4e-66 | ZHD6_ARATH; Zinc-finger homeodomain protein 6 | ||||
| TrEMBL | A0A068U322 | 1e-84 | A0A068U322_COFCA; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_6.121 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM6515 | 25 | 43 | Representative plant | OGRP91 | 16 | 237 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT2G18350.1 | 9e-52 | homeobox protein 24 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_6.121 |




