![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_6.130 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | bHLH | ||||||||
| Protein Properties | Length: 337aa MW: 37183 Da PI: 6.5308 | ||||||||
| Description | bHLH family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | HLH | 29.1 | 1.8e-09 | 205 | 252 | 4 | 55 |
HHHHHHHHHHHHHHHHHHHHHCTSCCC...TTS-STCHHHHHHHHHHHHHHH CS
HLH 4 ahnerErrRRdriNsafeeLrellPkaskapskKlsKaeiLekAveYIksLq 55
+h+ +Er RR++i +++ L++l+P + ++ Ka +L + ++Y++sLq
evm.model.supercontig_6.130 205 SHSLAERARREKISKKMKCLQDLVPGC----NRITGKAGMLDEIINYVQSLQ 252
8**************************....9*******************9 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SuperFamily | SSF47459 | 2.88E-16 | 199 | 270 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| CDD | cd00083 | 3.62E-9 | 199 | 256 | No hit | No description |
| Gene3D | G3DSA:4.10.280.10 | 1.6E-17 | 201 | 270 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| PROSITE profile | PS50888 | 15.218 | 201 | 251 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Pfam | PF00010 | 3.4E-7 | 205 | 252 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| SMART | SM00353 | 1.6E-9 | 207 | 257 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0009299 | Biological Process | mRNA transcription | ||||
| GO:0009735 | Biological Process | response to cytokinin | ||||
| GO:0009826 | Biological Process | unidimensional cell growth | ||||
| GO:0043425 | Molecular Function | bHLH transcription factor binding | ||||
| GO:0044212 | Molecular Function | transcription regulatory region DNA binding | ||||
| GO:0046983 | Molecular Function | protein dimerization activity | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 337 aa Download sequence Send to blast |
MLQGLISPES FAGNGAVDLM VQERLKWQRQ QQPQPATDVV GSQLSSIEFS SAPQFHGLLE 60 NVAGGRLFVQ PKRQEAFLGS YELPKFGKFS VVGTDLVGGR VDFPASDCRV EAADMAMVMK 120 KEEEKVEGEA FGSTEEQKFN KRKTEGVGRE EYKEKRIKTE VETESSFKAK SSTDTETSKQ 180 NSTTSQAQKP DYIHVRARRG QATDSHSLAE RARREKISKK MKCLQDLVPG CNRITGKAGM 240 LDEIINYVQS LQRQVEFLSM KLAALNPSVE FNPSQQCTAN CMLDVSMDFI SAQTPPLEST 300 SSSMTSLIFT GIDDFGLCHE QQRDLAGTGT KLVRGN* |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Atypical bHLH transcription factor that acts as positive regulator of cell elongation downstream of multiple external and endogenous signals by direct binding to the promoters and activation of the two expansin genes EXPA1 and EXPA8, encoding cell wall loosening enzymes. Transcriptional activity is inhibited when binding to the bHLH transcription factor IBH1. {ECO:0000269|PubMed:23221598}. | |||||
| Binding Motif ? help Back to Top | |||
|---|---|---|---|
| Motif ID | Method | Source | Motif file |
| MP00106 | PBM | Transfer from AT2G18300 | Download |
| |||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_6.130 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | Retrieve | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021907848.1 | 0.0 | transcription factor HBI1-like | ||||
| Swissprot | Q9ZPW3 | 2e-64 | HBI1_ARATH; Transcription factor HBI1 | ||||
| TrEMBL | A0A061DFN0 | 9e-85 | A0A061DFN0_THECC; Basic helix-loop-helix DNA-binding superfamily protein, putative isoform 3 | ||||
| STRING | evm.model.supercontig_6.130 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM3406 | 23 | 63 | Representative plant | OGRP58 | 16 | 313 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT2G18300.1 | 4e-62 | bHLH family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_6.130 |




