![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_6.175 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | bZIP | ||||||||
| Protein Properties | Length: 169aa MW: 18488.7 Da PI: 5.2319 | ||||||||
| Description | bZIP family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | bZIP_1 | 39.1 | 1.6e-12 | 31 | 73 | 5 | 47 |
CHHHCHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH CS
bZIP_1 5 krerrkqkNReAArrsRqRKkaeieeLeekvkeLeaeNkaLkk 47
++ +r+q+NRe+ArrsR RK++ ++ L v +L++eN +
evm.model.supercontig_6.175 31 RKRKRMQSNRESARRSRMRKQKHLDDLMAQVSQLSKENNQILT 73
6789**********************************87654 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SMART | SM00338 | 2.0E-17 | 27 | 91 | IPR004827 | Basic-leucine zipper domain |
| PROSITE profile | PS50217 | 10.622 | 29 | 92 | IPR004827 | Basic-leucine zipper domain |
| Gene3D | G3DSA:1.20.5.170 | 6.4E-11 | 30 | 106 | No hit | No description |
| SuperFamily | SSF57959 | 9.14E-12 | 31 | 81 | No hit | No description |
| Pfam | PF00170 | 3.0E-10 | 31 | 71 | IPR004827 | Basic-leucine zipper domain |
| CDD | cd14702 | 4.10E-18 | 32 | 83 | No hit | No description |
| PROSITE pattern | PS00036 | 0 | 34 | 49 | IPR004827 | Basic-leucine zipper domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| GO:0043565 | Molecular Function | sequence-specific DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 169 aa Download sequence Send to blast |
MACSSTGASS GSSALRSSSS EEDLQQIMDQ RKRKRMQSNR ESARRSRMRK QKHLDDLMAQ 60 VSQLSKENNQ ILTSMTITSQ LYSTIEAENS VLRAQVTELS HRLQSLNEIV DLVSSGCNGA 120 GSAGVVGGHE MFDQISGDDG FMAMMMNPWE DSLFVNQPIM AATDYVLS* |
| Nucleic Localization Signal ? help Back to Top | |||
|---|---|---|---|
| No. | Start | End | Sequence |
| 1 | 30 | 51 | RKRKRMQSNRESARRSRMRKQK |
| 2 | 43 | 50 | RRSRMRKQ |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Transcription factor that binds to the DNA G-box motif 5'-CACGTG-3' of MAN7 promoter. Involved in the positive regulation of seed germination through MAN7 gene activation. MAN7 is required for both, loosening of the micropylar endosperm, and rupture of the seed coat in germinating seeds. {ECO:0000269|PubMed:23461773}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_6.175 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021907836.1 | 1e-121 | bZIP transcription factor 2-like | ||||
| Swissprot | C0Z2L5 | 5e-50 | BZP44_ARATH; bZIP transcription factor 44 | ||||
| TrEMBL | A0A0J8FKP2 | 2e-53 | A0A0J8FKP2_BETVU; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_6.175 | 1e-120 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM501 | 28 | 154 | Representative plant | OGRP551 | 16 | 78 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT2G18160.1 | 3e-50 | basic leucine-zipper 2 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_6.175 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




