![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_6.202 | ||||||||
| Common Name | MADS2 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | MIKC_MADS | ||||||||
| Protein Properties | Length: 228aa MW: 26493.2 Da PI: 9.8134 | ||||||||
| Description | MIKC_MADS family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | SRF-TF | 92 | 2.9e-29 | 9 | 59 | 1 | 51 |
S---SHHHHHHHHHHHHHHHHHHHHHHHHHHT-EEEEEEE-TTSEEEEEE- CS
SRF-TF 1 krienksnrqvtfskRrngilKKAeELSvLCdaevaviifsstgklyeyss 51
krien +nrqvt+skRrngi+KKA+EL vLCda+v++i++s+tgkl+e++s
evm.model.supercontig_6.202 9 KRIENPTNRQVTYSKRRNGIFKKAQELTVLCDAKVSLIMISNTGKLHEFIS 59
79***********************************************86 PP
| |||||||
| 2 | K-box | 83.4 | 5.1e-28 | 71 | 169 | 1 | 99 |
K-box 1 yqkssgksleeakaeslqqelakLkkeienLqreqRhllGedLesLslkeLqqLeqqLekslkkiRskKnellleqieelqk 82
yq++ g++l++++++++q +l+kL++ +++L+re+R++ GedL+++s++eL+ Leq++ ++l+ iR++K + +++ +++ +k
evm.model.supercontig_6.202 71 YQSTLGVDLWSTHYQKMQDNLKKLRDINSKLRREIRRRNGEDLHDMSVEELRGLEQNMASALEVIRERKFHTIKTLTDTYKK 152
78888999************************************************************************** PP
K-box 83 kekelqeenkaLrkkle 99
k ++l+e+n +L k++
evm.model.supercontig_6.202 153 KVRNLEEQNGNLLLKFD 169
************98876 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SMART | SM00432 | 6.4E-41 | 1 | 60 | IPR002100 | Transcription factor, MADS-box |
| PROSITE profile | PS50066 | 32.436 | 1 | 61 | IPR002100 | Transcription factor, MADS-box |
| SuperFamily | SSF55455 | 2.22E-36 | 2 | 94 | IPR002100 | Transcription factor, MADS-box |
| CDD | cd00265 | 3.02E-40 | 2 | 80 | No hit | No description |
| PROSITE pattern | PS00350 | 0 | 3 | 57 | IPR002100 | Transcription factor, MADS-box |
| PRINTS | PR00404 | 9.4E-28 | 3 | 23 | IPR002100 | Transcription factor, MADS-box |
| Pfam | PF00319 | 5.3E-24 | 10 | 57 | IPR002100 | Transcription factor, MADS-box |
| PRINTS | PR00404 | 9.4E-28 | 23 | 38 | IPR002100 | Transcription factor, MADS-box |
| PRINTS | PR00404 | 9.4E-28 | 38 | 59 | IPR002100 | Transcription factor, MADS-box |
| Pfam | PF01486 | 4.4E-20 | 82 | 168 | IPR002487 | Transcription factor, K-box |
| PROSITE profile | PS51297 | 14.726 | 84 | 174 | IPR002487 | Transcription factor, K-box |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0010093 | Biological Process | specification of floral organ identity | ||||
| GO:0005634 | Cellular Component | nucleus | ||||
| GO:0003677 | Molecular Function | DNA binding | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| GO:0046983 | Molecular Function | protein dimerization activity | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 228 aa Download sequence Send to blast |
MGRGKIEIKR IENPTNRQVT YSKRRNGIFK KAQELTVLCD AKVSLIMISN TGKLHEFISP 60 TTTTKKMIDQ YQSTLGVDLW STHYQKMQDN LKKLRDINSK LRREIRRRNG EDLHDMSVEE 120 LRGLEQNMAS ALEVIRERKF HTIKTLTDTY KKKVRNLEEQ NGNLLLKFDT GCHNDPHYGL 180 VENERDYESA IALANEASNL QAFRLHHNHH PNNLYLGRFD CSDLRLA* |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 5f28_A | 2e-14 | 1 | 59 | 1 | 59 | MEF2C |
| 5f28_B | 2e-14 | 1 | 59 | 1 | 59 | MEF2C |
| 5f28_C | 2e-14 | 1 | 59 | 1 | 59 | MEF2C |
| 5f28_D | 2e-14 | 1 | 59 | 1 | 59 | MEF2C |
| Search in ModeBase | ||||||
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Probable transcription factor involved in flower development. {ECO:0000250|UniProtKB:Q0HA25}. | |||||
| Binding Motif ? help Back to Top | |||
|---|---|---|---|
| Motif ID | Method | Source | Motif file |
| MP00077 | ChIP-seq | Transfer from AT3G54340 | Download |
| |||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_6.202 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | Retrieve | ||||
| Annotation -- Nucleotide ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | |||
| GenBank | EF562498 | 0.0 | EF562498.1 Carica papaya B-class MADS-box protein TM6-1 mRNA, complete cds. | |||
| GenBank | EU659991 | 0.0 | EU659991.1 Carica papaya MADS2 (MADS2) mRNA, complete cds. | |||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021907972.1 | 1e-170 | floral homeotic protein DEFICIENS-like isoform X1 | ||||
| Swissprot | Q003J2 | 1e-120 | TM6_VITVI; Agamous-like MADS-box protein TM6 | ||||
| TrEMBL | A5JSC5 | 1e-168 | A5JSC5_CARPA; B-class MADS-box protein TM6-1 | ||||
| STRING | evm.model.supercontig_6.202 | 1e-169 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM5261 | 27 | 50 | Representative plant | OGRP5199 | 11 | 21 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT3G54340.1 | 1e-69 | MIKC_MADS family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_6.202 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




