![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_6.244 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | WOX | ||||||||
| Protein Properties | Length: 313aa MW: 35025.1 Da PI: 6.4481 | ||||||||
| Description | WOX family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | Homeobox | 61.1 | 1.8e-19 | 28 | 89 | 2 | 57 |
T--SS--HHHHHHHHHHHHH..SSS--HHHHHHHHHHC....TS-HHHHHHHHHHHHHHHHC CS
Homeobox 2 rkRttftkeqleeLeelFek..nrypsaeereeLAkkl....gLterqVkvWFqNrRakekk 57
++R+t+t++q+++L++l+++ r p+a+++++++++l +++ ++V++WFqN++a+e++
evm.model.supercontig_6.244 28 STRWTPTSDQIRILKDLYYNsgVRSPTADQIQRISARLrqygKIEGKNVFYWFQNHKARERQ 89
58*****************8789*************************************97 PP
| |||||||
| 2 | Wus_type_Homeobox | 114.6 | 4.9e-37 | 27 | 91 | 2 | 65 |
Wus_type_Homeobox 2 artRWtPtpeQikiLeelyk.sGlrtPnkeeiqritaeLeeyGkiedkNVfyWFQNrkaRerqkq 65
++tRWtPt++Qi+iL++ly+ sG+r+P++++iqri+a+L++yGkie+kNVfyWFQN+kaRerqk+
evm.model.supercontig_6.244 27 SSTRWTPTSDQIRILKDLYYnSGVRSPTADQIQRISARLRQYGKIEGKNVFYWFQNHKARERQKK 91
789***************9779*****************************************96 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SuperFamily | SSF46689 | 6.42E-11 | 23 | 92 | IPR009057 | Homeodomain-like |
| PROSITE profile | PS50071 | 10.349 | 24 | 90 | IPR001356 | Homeobox domain |
| SMART | SM00389 | 3.5E-5 | 26 | 94 | IPR001356 | Homeobox domain |
| Gene3D | G3DSA:1.10.10.60 | 8.4E-7 | 29 | 89 | IPR009057 | Homeodomain-like |
| CDD | cd00086 | 1.79E-6 | 29 | 91 | No hit | No description |
| Pfam | PF00046 | 6.3E-17 | 29 | 89 | IPR001356 | Homeobox domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0010492 | Biological Process | maintenance of shoot apical meristem identity | ||||
| GO:0080166 | Biological Process | stomium development | ||||
| GO:0003677 | Molecular Function | DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 313 aa Download sequence Send to blast |
MEAHQQLNED SGGNKTGGGG NFLCRQSSTR WTPTSDQIRI LKDLYYNSGV RSPTADQIQR 60 ISARLRQYGK IEGKNVFYWF QNHKARERQK KRFTNSSNTT MSSEHVLLPM QRPSLPHSQA 120 HNNGVRKPNI NDQDSLHHKF SNTSYSSGIP ASAGVLTAPG AQMGNYAYGS VTMENRFRDC 180 SISPTGSSVA SGNGGPLNHH WVSIDHYSTS YNFFEKRKSV LTETIEEEEE EEEEDEQEEE 240 GGSSYYQEKE TLPLFPMHGE DHINGGFCRP SPSTGGYYRG WYRPDDGNYY GGSHASLELS 300 LNTYTGRSPD PL* |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Transcription factor that plays a central role during developmental processes such as early embryogenesis and flowering, probably by regulating expression of specific genes. Required to specify stem cell identity in meristems, such as shoot apical meristem (SAM). Acts in parallel with HAM. {ECO:0000269|PubMed:12208843}. | |||||
| Binding Motif ? help Back to Top | |||
|---|---|---|---|
| Motif ID | Method | Source | Motif file |
| MP00265 | DAP | Transfer from AT2G17950 | Download |
| |||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_6.244 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | Retrieve | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021908316.1 | 1e-172 | protein WUSCHEL, partial | ||||
| Swissprot | Q8LL11 | 6e-80 | WUS_PETHY; Protein WUSCHEL | ||||
| TrEMBL | A0A1Q3D8E1 | 6e-93 | A0A1Q3D8E1_CEPFO; Homeobox domain-containing protein | ||||
| STRING | evm.model.supercontig_6.244 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM5244 | 28 | 47 | Representative plant | OGRP9087 | 11 | 14 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT2G17950.1 | 7e-57 | WOX family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_6.244 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




