![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_6.255 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | bHLH | ||||||||
| Protein Properties | Length: 153aa MW: 17725.9 Da PI: 4.9859 | ||||||||
| Description | bHLH family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | HLH | 32.9 | 1.2e-10 | 58 | 107 | 1 | 54 |
CHHHHHHHHHHHHHHHHHHHHHHHCTSCCC...TTS-STCHHHHHHHHHHHHHH CS
HLH 1 rrrahnerErrRRdriNsafeeLrellPkaskapskKlsKaeiLekAveYIksL 54
r++ + rE+ RRd++N+ f eL l ++ +K++Ka+iL+ +++ +k+L
evm.model.supercontig_6.255 58 RKVQKADREKLRRDQLNEQFLELANTLDPD----RPKNDKATILTDTIQMLKDL 107
5777889********************997....79****************98 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| PROSITE profile | PS50888 | 13.084 | 57 | 107 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| SuperFamily | SSF47459 | 1.02E-13 | 57 | 128 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene3D | G3DSA:4.10.280.10 | 2.4E-12 | 58 | 130 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| CDD | cd00083 | 1.94E-5 | 58 | 111 | No hit | No description |
| Pfam | PF00010 | 3.0E-8 | 58 | 107 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| SMART | SM00353 | 1.3E-6 | 63 | 113 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0046983 | Molecular Function | protein dimerization activity | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 153 aa Download sequence Send to blast |
MDQWNARDFS ESVVAEFGPS TSMPSSNHAQ NQNSMPERSR RRPEVEVKVE VKDPITARKV 60 QKADREKLRR DQLNEQFLEL ANTLDPDRPK NDKATILTDT IQMLKDLTSE VNRLKVEYDA 120 LSEESRELMQ EKNEIREEKA SLKSELIHIQ FL* |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_6.255 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021907855.1 | 1e-98 | transcription factor bHLH121-like isoform X3 | ||||
| Swissprot | Q9LT23 | 8e-41 | BH121_ARATH; Transcription factor bHLH121 | ||||
| TrEMBL | D7SNZ5 | 4e-58 | D7SNZ5_VITVI; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_6.255 | 1e-106 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM2353 | 27 | 62 | Representative plant | OGRP3401 | 14 | 25 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT3G19860.1 | 1e-43 | bHLH family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_6.255 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




