![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_62.11 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | ERF | ||||||||
| Protein Properties | Length: 296aa MW: 32186.1 Da PI: 7.2538 | ||||||||
| Description | ERF family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | AP2 | 63.1 | 6.1e-20 | 142 | 190 | 3 | 55 |
AP2 3 ykGVrwdkkrgrWvAeIrdpsengkr.krfslgkfgtaeeAakaaiaarkkleg 55
++GVr+++ +g+W+AeIrdp+ r +r++lg+f taeeAa+a+++a+ ++g
evm.model.supercontig_62.11 142 FRGVRQRP-WGKWAAEIRDPR----RaTRVWLGTFNTAEEAARAYDRAAIDFRG 190
8*******.**********82....48**********************98887 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| PROSITE profile | PS51032 | 24.698 | 141 | 198 | IPR001471 | AP2/ERF domain |
| Gene3D | G3DSA:3.30.730.10 | 2.1E-32 | 141 | 198 | IPR001471 | AP2/ERF domain |
| SMART | SM00380 | 2.6E-39 | 141 | 204 | IPR001471 | AP2/ERF domain |
| CDD | cd00018 | 5.20E-35 | 141 | 198 | No hit | No description |
| PRINTS | PR00367 | 9.1E-12 | 142 | 153 | IPR001471 | AP2/ERF domain |
| Pfam | PF00847 | 4.5E-14 | 142 | 190 | IPR001471 | AP2/ERF domain |
| SuperFamily | SSF54171 | 1.7E-22 | 142 | 199 | IPR016177 | DNA-binding domain |
| PRINTS | PR00367 | 9.1E-12 | 164 | 180 | IPR001471 | AP2/ERF domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0001944 | Biological Process | vasculature development | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0010200 | Biological Process | response to chitin | ||||
| GO:0050832 | Biological Process | defense response to fungus | ||||
| GO:0051301 | Biological Process | cell division | ||||
| GO:0003677 | Molecular Function | DNA binding | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 296 aa Download sequence Send to blast |
MQSSLKRPRV TGALTSTTAT EIFPTVPIQI PTPIPSPTSF VRLSPEQELS VMVSALKHVI 60 SGTESSTNAT ADAFGVNNSA SFTASGNAVL PPTELDTCQV CRIEGCLGCN FFPPTQQDAA 120 SAVVEGGGNK KGKGKKRVKK NFRGVRQRPW GKWAAEIRDP RRATRVWLGT FNTAEEAARA 180 YDRAAIDFRG PRAKLNFPFV DYTSLPPAEN EQTTSLKKQK QQQETESSKI NDGVFSTEME 240 SGKGKEIFEF GKGKENELLE FGIGELDYIQ EWITMMDFCH GDSSDSATTA NTLSS* |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 1gcc_A | 2e-23 | 140 | 199 | 1 | 61 | ETHYLENE RESPONSIVE ELEMENT BINDING FACTOR 1 |
| Search in ModeBase | ||||||
| Binding Motif ? help Back to Top | |||
|---|---|---|---|
| Motif ID | Method | Source | Motif file |
| MP00469 | DAP | Transfer from AT4G34410 | Download |
| |||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_62.11 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | Retrieve | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021896704.1 | 0.0 | ethylene-responsive transcription factor ERF109-like | ||||
| TrEMBL | A0A0C5AHM3 | 8e-80 | A0A0C5AHM3_BETPL; ERF2 protein | ||||
| STRING | evm.model.supercontig_62.11 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM5469 | 24 | 49 | Representative plant | OGRP6 | 16 | 1718 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT4G34410.1 | 2e-44 | redox responsive transcription factor 1 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_62.11 |




