![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_65.141 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | HD-ZIP | ||||||||
| Protein Properties | Length: 188aa MW: 21211.1 Da PI: 8.6063 | ||||||||
| Description | HD-ZIP family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | Homeobox | 61.2 | 1.6e-19 | 42 | 96 | 2 | 56 |
T--SS--HHHHHHHHHHHHHSSS--HHHHHHHHHHCTS-HHHHHHHHHHHHHHHH CS
Homeobox 2 rkRttftkeqleeLeelFeknrypsaeereeLAkklgLterqVkvWFqNrRakek 56
rk+ ++tkeq + Lee F++n++++ +++e LA++l+L rqV vWFqNrRa+ k
evm.model.supercontig_65.141 42 RKKLRLTKEQSRLLEESFRQNHTLNPKQKETLATQLKLRPRQVEVWFQNRRARSK 96
78889************************************************98 PP
| |||||||
| 2 | HD-ZIP_I/II | 119.7 | 1.6e-38 | 42 | 130 | 1 | 89 |
HD-ZIP_I/II 1 ekkrrlskeqvklLEesFeeeekLeperKvelareLglqprqvavWFqnrRARtktkqlEkdyeaLkraydalkeenerLe 81
+kk+rl+keq++lLEesF+++++L+p++K++la++L+l+prqv+vWFqnrRAR k+kq+E+++e+Lkr++ +l+e+n+rL+
evm.model.supercontig_65.141 42 RKKLRLTKEQSRLLEESFRQNHTLNPKQKETLATQLKLRPRQVEVWFQNRRARSKLKQTEMECEYLKRWFGSLTEQNRRLQ 122
69******************************************************************************* PP
HD-ZIP_I/II 82 keveeLre 89
+eveeLr+
evm.model.supercontig_65.141 123 REVEELRA 130
******94 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| Gene3D | G3DSA:1.10.10.60 | 2.4E-18 | 30 | 92 | IPR009057 | Homeodomain-like |
| SuperFamily | SSF46689 | 3.08E-19 | 33 | 99 | IPR009057 | Homeodomain-like |
| PROSITE profile | PS50071 | 17.394 | 38 | 98 | IPR001356 | Homeobox domain |
| SMART | SM00389 | 1.7E-17 | 40 | 102 | IPR001356 | Homeobox domain |
| CDD | cd00086 | 2.83E-16 | 41 | 99 | No hit | No description |
| Pfam | PF00046 | 7.0E-17 | 42 | 96 | IPR001356 | Homeobox domain |
| PROSITE pattern | PS00027 | 0 | 73 | 96 | IPR017970 | Homeobox, conserved site |
| Pfam | PF02183 | 5.4E-10 | 98 | 132 | IPR003106 | Leucine zipper, homeobox-associated |
| SMART | SM00340 | 4.4E-22 | 98 | 141 | IPR003106 | Leucine zipper, homeobox-associated |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| GO:0043565 | Molecular Function | sequence-specific DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 188 aa Download sequence Send to blast |
MKGDYCAVKE LDINQVPSGE EEWTAGATVE EEEESSNGGP PRKKLRLTKE QSRLLEESFR 60 QNHTLNPKQK ETLATQLKLR PRQVEVWFQN RRARSKLKQT EMECEYLKRW FGSLTEQNRR 120 LQREVEELRA MKVGPPTVIS PHSCEPLPAS TLTMCPRCER VTSTAPTAVL DTTAKAGPPR 180 QSSSAAC* |
| Nucleic Localization Signal ? help Back to Top | |||
|---|---|---|---|
| No. | Start | End | Sequence |
| 1 | 90 | 98 | RRARSKLKQ |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Probable transcription repressor that binds to the DNA sequence 5'-CAAT[GC]ATTG-3'. {ECO:0000269|PubMed:10732669}. | |||||
| UniProt | Probable transcription repressor that binds to the DNA sequence 5'-CAAT[GC]ATTG-3'. {ECO:0000269|PubMed:10732669}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_65.141 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021896220.1 | 1e-128 | homeobox-leucine zipper protein HOX3 | ||||
| Swissprot | Q0JKX1 | 2e-81 | HOX3_ORYSJ; Homeobox-leucine zipper protein HOX3 | ||||
| Swissprot | Q9XH38 | 2e-81 | HOX3_ORYSI; Homeobox-leucine zipper protein HOX3 | ||||
| TrEMBL | A0A0L9VAC1 | 1e-101 | A0A0L9VAC1_PHAAN; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_65.141 | 1e-134 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM4890 | 27 | 47 | Representative plant | OGRP196 | 16 | 156 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT2G01430.1 | 9e-70 | homeobox-leucine zipper protein 17 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_65.141 |




