![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_69.72 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | YABBY | ||||||||
| Protein Properties | Length: 190aa MW: 21147.7 Da PI: 8.0596 | ||||||||
| Description | YABBY family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | YABBY | 156.4 | 2.4e-48 | 1 | 143 | 23 | 169 |
YABBY 23 avsvPstslfkvvtvrCGhCtsllsvnlakas.....qllaaeshldeslkeelleelkveeenlksnvekeesastsvsse 99
+vsvP +sl++ vtvrCG+Ctsllsvn++k+s lla+ s+ d ++++e + k + ++ ++s s+
evm.model.supercontig_69.72 1 MVSVPCSSLSTAVTVRCGCCTSLLSVNMMKSSfvplhLLLASLSR-DG---------EGKKEASPKDGDGCRRLDRQSPSML 72
59**************************99884443222233332.22.........2222222222222222222222222 PP
YABBY 100 klsenedeevprvpp.virPPekrqrvPsaynrfikeeiqrikasnPdishreafsaaaknWahfPkihfg 169
+ s+ e+e+ ++ + v++PPekrqr+Psayn+fikeei+r+ka+nP+++h+eafs+aaknWa fP+ h+
evm.model.supercontig_69.72 73 TSSDYEEEDGIHINQiVNKPPEKRQRAPSAYNCFIKEEIRRLKAHNPNMTHKEAFSTAAKNWAQFPPTHYR 143
22444555555666659****************************************************86 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| Pfam | PF04690 | 2.4E-49 | 1 | 142 | IPR006780 | YABBY protein |
| SuperFamily | SSF47095 | 3.8E-9 | 87 | 139 | IPR009071 | High mobility group box domain |
| Gene3D | G3DSA:1.10.30.10 | 3.3E-6 | 90 | 140 | IPR009071 | High mobility group box domain |
| CDD | cd00084 | 0.00158 | 98 | 139 | No hit | No description |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0009944 | Biological Process | polarity specification of adaxial/abaxial axis | ||||
| GO:0048481 | Biological Process | plant ovule development | ||||
| GO:0005634 | Cellular Component | nucleus | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 190 aa Download sequence Send to blast |
MVSVPCSSLS TAVTVRCGCC TSLLSVNMMK SSFVPLHLLL ASLSRDGEGK KEASPKDGDG 60 CRRLDRQSPS MLTSSDYEEE DGIHINQIVN KPPEKRQRAP SAYNCFIKEE IRRLKAHNPN 120 MTHKEAFSTA AKNWAQFPPT HYRKDVECGE NQDPSETTWN SDALEGSTAG FRERKAPRNS 180 IWARTPFDQ* |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Essential for the formation and the abaxial-adaxial asymmetric growth of the ovule outer integument. {ECO:0000269|PubMed:10601041, ECO:0000269|PubMed:12183380, ECO:0000269|PubMed:9093862, ECO:0000269|PubMed:9118807}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_69.72 |
| Regulation -- Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | INDUCTION: Autoinduction down-regulated by SUP in adaxial region of the ovule outer integument. Negatively and spatially regulated by HLL, ANT, BELL1, NZZ/SPL and SUP. {ECO:0000269|PubMed:10601041, ECO:0000269|PubMed:12183380, ECO:0000269|PubMed:12183381}. | |||||
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021895878.1 | 1e-140 | axial regulator YABBY 4 | ||||
| Swissprot | Q9LDT3 | 3e-62 | YAB4_ARATH; Axial regulator YABBY 4 | ||||
| TrEMBL | A0A1R3I6W4 | 2e-74 | A0A1R3I6W4_COCAP; YABBY protein | ||||
| STRING | evm.model.supercontig_69.72 | 1e-141 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM8044 | 27 | 40 | Representative plant | OGRP9612 | 7 | 12 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT1G23420.1 | 1e-64 | YABBY family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_69.72 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




