![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_7.253 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | CPP | ||||||||
| Protein Properties | Length: 485aa MW: 53341.6 Da PI: 6.9148 | ||||||||
| Description | CPP family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | TCR | 24.4 | 5.7e-08 | 12 | 37 | 16 | 42 |
TCR 16 kYCeCfaagkkCseeCkCedCkNkeek 42
+YCeCfaag +C+ C+C +C+N+ e+
evm.model.supercontig_7.253 12 RYCECFAAGIYCDG-CNCLNCHNNVEN 37
6*************.********9875 PP
| |||||||
| 2 | TCR | 50 | 6e-16 | 82 | 121 | 1 | 40 |
TCR 1 kekkgCnCkkskClkkYCeCfaagkkCseeCkCedCkNke 40
k++kgC+Ckks ClkkYCeCf+a+ Cse+CkC +CkN e
evm.model.supercontig_7.253 82 KHNKGCHCKKSGCLKKYCECFQANILCSENCKCLECKNFE 121
589***********************************65 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| PROSITE profile | PS51634 | 30.85 | 1 | 122 | IPR005172 | CRC domain |
| SMART | SM01114 | 0.0031 | 12 | 37 | IPR033467 | Tesmin/TSO1-like CXC domain |
| Pfam | PF03638 | 1.1E-5 | 12 | 34 | IPR005172 | CRC domain |
| SMART | SM01114 | 2.6E-18 | 82 | 123 | IPR033467 | Tesmin/TSO1-like CXC domain |
| Pfam | PF03638 | 1.3E-12 | 85 | 120 | IPR005172 | CRC domain |
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 485 aa Download sequence Send to blast |
MSIHEQNIAI FRYCECFAAG IYCDGCNCLN CHNNVENEDA RQDAVGATLG RNPNAFRPKI 60 ASSPCGSHNA KEDLEEVQMV GKHNKGCHCK KSGCLKKYCE CFQANILCSE NCKCLECKNF 120 EGSEERRGVL HGNPNTIAYV QQAANAAITG AIGLSGYVAS TATKKRKIEE LLFSLAAKEP 180 SIQMAAKCQQ ENPLCNHSVS SLLSVPVSQT VNRAVLGSSK SPYRSPLADI LQLQDIQKLC 240 SDMIIISLGA TLTHEENRKE MDRHVETDYY SVQTSIFSSV EARETSKKIK DTLEGVGDVR 300 LTENQVDRDS IINCSAIRDD FQNERPVSPG TRALMCDEKD SILMASLATR MAGHCIKTNQ 360 TSLKEYEHSE AYAEQERLVL TRFRDFLNRL ITCGSIKETM CSPMTRSETA KAGTKIENQK 420 QTYCNGNLKP SFPMLVEKAE TETAPISSSS DGLTLKVGFS VGKGELCWVH LTLFTQHLIA 480 ALSL* |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 5fd3_A | 1e-24 | 6 | 131 | 18 | 132 | Protein lin-54 homolog |
| 5fd3_B | 1e-24 | 6 | 131 | 18 | 132 | Protein lin-54 homolog |
| Search in ModeBase | ||||||
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Plays a role in development of both male and female reproductive tissues. {ECO:0000250}. | |||||
| Binding Motif ? help Back to Top | |||
|---|---|---|---|
| Motif ID | Method | Source | Motif file |
| MP00045 | PBM | Transfer from AT4G29000 | Download |
| |||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_7.253 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | - | Retrieve | ||||
| Annotation -- Nucleotide ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | |||
| GenBank | AP015035 | 3e-38 | AP015035.1 Vigna angularis var. angularis DNA, chromosome 2, almost complete sequence, cultivar: Shumari. | |||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021907759.1 | 0.0 | protein tesmin/TSO1-like CXC 5 | ||||
| Swissprot | Q9SZD1 | 1e-118 | TCX5_ARATH; Protein tesmin/TSO1-like CXC 5 | ||||
| TrEMBL | A0A061GJZ2 | 1e-164 | A0A061GJZ2_THECC; Transcription factor, putative isoform 1 | ||||
| STRING | evm.model.supercontig_7.253 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM1783 | 28 | 84 | Representative plant | OGRP1469 | 17 | 45 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT4G29000.1 | 1e-117 | Tesmin/TSO1-like CXC domain-containing protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_7.253 |




