![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_7.269 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | ERF | ||||||||
| Protein Properties | Length: 190aa MW: 20970.3 Da PI: 6.683 | ||||||||
| Description | ERF family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | AP2 | 59.3 | 9.2e-19 | 37 | 87 | 1 | 55 |
AP2 1 sgykGVrwdkkrgrWvAeIrdpsengkrkrfslgkfgtaeeAakaaiaarkkleg 55
+ y+GVr + +g+Wv+eIr+p++ + r++lg+f t+e+Aa+a++ a+++++g
evm.model.supercontig_7.269 37 PVYRGVRMRN-WGKWVSEIREPRK---KSRIWLGTFSTPEMAARAHDVAALSIKG 87
68*****998.**********843...6***********************9987 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| Pfam | PF00847 | 6.5E-13 | 37 | 87 | IPR001471 | AP2/ERF domain |
| SuperFamily | SSF54171 | 5.3E-22 | 38 | 96 | IPR016177 | DNA-binding domain |
| Gene3D | G3DSA:3.30.730.10 | 2.6E-32 | 38 | 96 | IPR001471 | AP2/ERF domain |
| SMART | SM00380 | 1.1E-35 | 38 | 101 | IPR001471 | AP2/ERF domain |
| PROSITE profile | PS51032 | 23.13 | 38 | 95 | IPR001471 | AP2/ERF domain |
| PRINTS | PR00367 | 1.5E-10 | 39 | 50 | IPR001471 | AP2/ERF domain |
| CDD | cd00018 | 3.52E-33 | 39 | 97 | No hit | No description |
| PRINTS | PR00367 | 1.5E-10 | 61 | 77 | IPR001471 | AP2/ERF domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0045893 | Biological Process | positive regulation of transcription, DNA-templated | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| GO:0043565 | Molecular Function | sequence-specific DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 190 aa Download sequence Send to blast |
MSFPHHNLPS ETDTATSNSS SPQPKKTKRM RDSSKHPVYR GVRMRNWGKW VSEIREPRKK 60 SRIWLGTFST PEMAARAHDV AALSIKGNSA ILNFPDLASS LPRPVSLAPR DVQAAAAKAA 120 QMDNFHSPTP TTLSSSTSLS SLVSAMDITE PDELSEIVEL PSLGANYEEF VLFESPWLED 180 CGYIGSDYQX |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 5wx9_A | 1e-19 | 33 | 95 | 9 | 72 | Ethylene-responsive transcription factor ERF096 |
| Search in ModeBase | ||||||
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Probably acts as a transcriptional activator. Binds to the GCC-box pathogenesis-related promoter element. May be involved in the regulation of gene expression by stress factors and by components of stress signal transduction pathways (By similarity). {ECO:0000250}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_7.269 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021907680.1 | 1e-138 | dehydration-responsive element-binding protein 3 | ||||
| Swissprot | Q9LYD3 | 3e-66 | DREB3_ARATH; Dehydration-responsive element-binding protein 3 | ||||
| TrEMBL | A0A061GK29 | 2e-69 | A0A061GK29_THECC; Integrase-type DNA-binding superfamily protein | ||||
| STRING | evm.model.supercontig_7.269 | 1e-137 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM185 | 28 | 283 | Representative plant | OGRP6 | 16 | 1718 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT5G11590.1 | 1e-63 | ERF family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_7.269 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




