![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_73.3 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | WOX | ||||||||
| Protein Properties | Length: 280aa MW: 30621 Da PI: 6.8805 | ||||||||
| Description | WOX family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | Homeobox | 48 | 2.2e-15 | 25 | 85 | 2 | 57 |
T--SS--HHHHHHHHHHHHH.SSS--HHHHHHHHHHC....TS-HHHHHHHHHHHHHHHHC CS
Homeobox 2 rkRttftkeqleeLeelFek.nrypsaeereeLAkkl....gLterqVkvWFqNrRakekk 57
r+R+t+++eq+ +Le+ F++ +p ++e ++ k l + +++V++WFqNrR + ++
evm.model.supercontig_73.3 25 RSRWTPKPEQILILESIFNSgMVNPPKDETVRIRKLLekfgAVGDANVFYWFQNRRSRSRR 85
89*****************99*************************************997 PP
| |||||||
| 2 | Wus_type_Homeobox | 107.6 | 7.4e-35 | 24 | 87 | 2 | 65 |
Wus_type_Homeobox 2 artRWtPtpeQikiLeelyksGlrtPnkeeiqritaeLeeyGkiedkNVfyWFQNrkaRerqkq 65
+r+RWtP+peQi iLe++++sG+++P+k+e+ ri++ Le++G+++d+NVfyWFQNr++R+r++q
evm.model.supercontig_73.3 24 VRSRWTPKPEQILILESIFNSGMVNPPKDETVRIRKLLEKFGAVGDANVFYWFQNRRSRSRRRQ 87
589***********************************************************97 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SuperFamily | SSF46689 | 2.48E-14 | 18 | 92 | IPR009057 | Homeodomain-like |
| PROSITE profile | PS50071 | 11.321 | 21 | 86 | IPR001356 | Homeobox domain |
| SMART | SM00389 | 2.8E-6 | 23 | 90 | IPR001356 | Homeobox domain |
| Gene3D | G3DSA:1.10.10.60 | 1.0E-8 | 24 | 90 | IPR009057 | Homeodomain-like |
| Pfam | PF00046 | 4.1E-13 | 25 | 85 | IPR001356 | Homeobox domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0009734 | Biological Process | auxin-activated signaling pathway | ||||
| GO:0048830 | Biological Process | adventitious root development | ||||
| GO:0003677 | Molecular Function | DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 280 aa Download sequence Send to blast |
MEDQASAADS NSSSSHGSER SEPVRSRWTP KPEQILILES IFNSGMVNPP KDETVRIRKL 60 LEKFGAVGDA NVFYWFQNRR SRSRRRQRQL QASLAGDNQQ KNLLQQQQQQ QQQAQTSSGA 120 IQYHENSGCG VGFGSSSFGS SSSSSSPFLV SGSSSCGVIG DDGVESLFSM SGQMGFQEIE 180 QSVCPSDSSN LHYQPGFITV FINGVPTEVP RGPLDMKAIF GEGFVLVHSS GVPLPVNEFG 240 FLFHSLQHGY ETIMNSQQVK VQQMGASSMW LHQTRSRTL* |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Transcription factor which may be involved in developmental processes. {ECO:0000250}. | |||||
| Binding Motif ? help Back to Top | |||
|---|---|---|---|
| Motif ID | Method | Source | Motif file |
| MP00330 | DAP | Transfer from AT3G03660 | Download |
| |||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_73.3 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | Retrieve | ||||
| Annotation -- Nucleotide ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | |||
| GenBank | KF982710 | 2e-62 | KF982710.1 Populus tomentosa WOX11/12a (WOX11/12a) mRNA, complete cds. | |||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021895379.1 | 0.0 | WUSCHEL-related homeobox 11 | ||||
| Swissprot | Q6X7J3 | 2e-76 | WOX11_ARATH; WUSCHEL-related homeobox 11 | ||||
| TrEMBL | A0A061F179 | 1e-109 | A0A061F179_THECC; WUSCHEL related homeobox 11 | ||||
| STRING | evm.model.supercontig_73.3 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM2819 | 27 | 68 | Representative plant | OGRP4697 | 12 | 22 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT5G17810.2 | 5e-34 | WUSCHEL related homeobox 12 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_73.3 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




